Parcel 0038, Green Lane, Nempnett Thrubwell, Bristol, Bath And North East Somerset, Data via plota.co.uk

26/02100/COND - Discharge of Condition Pending Consideration

Proposal

Discharge of conditions 2 (Biodiversity Gain Plan), 3 (Landscape Design Proposals), 4 (Archaeological Evaluation), 5 (Archaeological Mitigation), 7 (Landscape and Ecological Management Plan) and 10 (External Lighting) of application (Extension to existing Solar Farm () to include ground mounted solar PV panels, ancillary infrastructure and equipment, landscaping and access arrangements) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Jun 2026
Decision
Target date was 31 Aug 2026

Under consideration

No decision has been issued yet. A decision is expected by 31 Aug 2026.

Associated applications 5

  • Part of

    Fullcouncil archive

    Conditions variation sought for

    • archive

      Conditions details submitted for 2, 3, 4, 5, 7, 10

      • ConditionsDischarge of conditions 2 (Biodiversity Gain Plan), 3 (Landscape Design Proposals), 4…This application26/02100/COND
    • Show 2 more · 2 approved

Site constraints 7

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Article 4 direction
Article 4 Avonmouth Village. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Old Passage, Aust to Wain's Hill, Clevedon about 7 m away
Matters where it crosses or adjoins the site; the route and its margin are protected.
National infrastructure project about 170 m away: Hinkley Point C Connection
The site is about 170 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Portishead Branch Line - MetroWest Phase 1 (decided, about 1289 m); Hinkley Point C Connection Project Material Change (at pre-application, about 167 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Special area of conservation about 428 m away: Severn Estuary; SSSI about 428 m away: Spring Cove Cliffs SSSI; Inside the Avonmouth built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bath - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bath
Application type
Discharge of Condition
Postcode
BS11 9JD
Received
1 Jun 2026
Validated
1 Jun 2026
Ward
Chew Valley
Parish
Nempnett Thrubwell
Case officer
Show
Target decision
31 Aug 2026
Applicant
Show
Agent
SLR Consulting

Consultation & key dates

Planning Portal ref
PP-14766235
Bath
Planning Authority Score
4.8/10
Below average
#157 of 296 councils
Relevant to this application:
Householder decisions

Bath is slower than most councils at deciding householder applications, ranking #236 out of 296. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Bath decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #17 of 296
97%
Householder approved
Above avg (90%) #26 of 296
50%
Decided in 8 weeks
Below avg (63%) #236 of 296
46%
Extended time limit
Above avg (41%) #199 of 296
87%
Minor dwellings approved
172 decided (1-9 homes)
86%
Major dwellings approved
7 decided (10+ homes)
85%
Change of use approved
26 decided
1,817
Total decisions
96 refused in the year to March 2026