Outgate Wastewater Treatment Works, Outgate, Hawkshead, LA22 0NH Data via plota.co.uk

7/2026/5281 - Full Planning application Application being considered

Proposal

Construction of an extended Wastewater Treatment Works including: Motor Control Centre Building; Standby Generator Batteries, Standby Generator; and temporary access junction off the B6286 Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 May 2026
✓
Validated
3 Jun 2026
✓
Consultation
10 Jun 2026
Decision
Expected by 16 Jul 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 9 Oct 2026; it is now day 128.

Site constraints 10

Water Supply and WasteArea of special control for advertsPrevious planning applicationsMineral Safeguarding Area
Lake District National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
World heritage site: The English Lake District
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Water Supply and WasteCouncil record
Recorded by the council for this site.
Council site ↗
Area of special control for advertsCouncil record
Recorded by the council for this site.
Council site ↗
Previous planning applicationsCouncil record
Recorded by the council for this site.
Council site ↗
Mineral Safeguarding AreaCouncil record
Recorded by the council for this site.
Council site ↗
Also on the record
Radon affected area, class 2; 1 listed building within 150 m.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Lake District - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning application
Postcode
LA22 0NH
Received
22 May 2026
Validated
3 Jun 2026
Ward
Coniston and Hawkshead Ward
Parish
Hawkshead
Case officer
Show
Target decision
16 Jul 2026
Applicant
Show

Decision outlook

Day 128, past the statutory target. 83% of utility and infrastructure works in Lake District are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 7 Oct 2026.

Day 12872 days past the 56-day target
69%decided within 8 weeks
95%approved
69decided in the last year

Plota live figures for utility and infrastructure works decided by Lake District in the last twelve months, from validation. Lake District decision record →

Consultation & key dates

Alt. reference
PP-14815802
Site or press notice
10 Jun 2026
Statutory expiry
8 Jul 2026