Barn At Grid Reference 240030 090207 Broadwoodwidger Devon Data via plota.co.uk

1/0015/2026/NMAT - No Mat difference to exist Plan Perm Refused

Proposal

Non-material amendment to planning approval (cladding) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
28 May 2026
✓
Validated
2 Jun 2026
✗
Refused
7 Aug 2026
Appeal
Not lodged

Refused on 7 Aug 2026 · Delegated Decision · Last checked 7 Aug 2026

Associated applications 2

  • Part of

    AmendmentApprovedcouncil archive
    • AmendmentNon-material amendment (cladding)RefusedThis application1/0015/2026/NMAT

Site constraints 4

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 4. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 4; 1 listed building within 150 m.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Torridge - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Torridge
Application type
No Mat difference to exist Plan Perm
Postcode
PL16 0JH
Received
28 May 2026
Validated
2 Jun 2026
Ward
Broadheath
Parish
Broadwoodwidger
Case officer
Show
Target decision
30 Jun 2026
Decision
Application Refused
Decision date
7 Aug 2026
Decision level
Delegated Decision
Applicant
Show
Agent
Mark Dyson Surveyors Ltd

Public comments

No public comments yet.

Last counted 7 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
30 Jun 2026
Env. assessment
No
Torridge
Planning Authority Score
7.6/10
Good
#40 of 296 councils
Relevant to this application:
Householder decisions

Torridge is faster than most councils at deciding householder applications, ranking #55 out of 296. Householder applications are more likely to be approved here than most councils, with a 98% approval rate vs 90% nationally.

More permissive than most councils
98% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Torridge decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #184 of 296
98%
Householder approved
Above avg (90%) #25 of 296
78%
Decided in 8 weeks
Above avg (63%) #55 of 296
38%
Extended time limit
Below avg (41%) #133 of 296
72%
Minor dwellings approved
155 decided (1-9 homes)
85%
Major dwellings approved
13 decided (10+ homes)
82%
Change of use approved
11 decided
554
Total decisions
71 refused in the year to March 2026