The Hamble School Satchell Lane, Hamble, SO31 4NE Data via plota.co.uk

CS/26/101488 - Consultations Decided Raise No Objection To

Proposal

HCC consultation request for the discharge of conditions 2 (landscaping), 3 (landscaping) and 5 (ecology) of planning permission CS/26/101093 (HCC ref: EAE032) for the external hard surfacing relating to the provision of a new modular classroom and adaptation of existing car park to accommodate pickup/drop off bays. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Validated
28 May 2026
✓
Received
29 May 2026
Decision
Expected by 18 Jun 2026

Under consideration

No decision has been issued yet. A decision is expected by 18 Jun 2026.

The consultation period closed on 23 Jun 2026.

Associated applications 2

Site constraints 3

Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 1
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. A site survey can differ.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Eastleigh - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Eastleigh
Application type
Consultations
Postcode
SO31 4NE
Received
29 May 2026
Validated
28 May 2026
Target decision
18 Jun 2026
Decision level
Delegated Decision
Agent
Hampshire County Council (Molly Snow)

Consultation & key dates

Comments by
23 Jun 2026
Eastleigh
Planning Authority Score
6.8/10
Good
#67 of 296 councils
Relevant to this application:
Householder decisions

Eastleigh is faster than most councils at deciding householder applications, ranking #94 out of 296. Only 27% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Eastleigh decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #111 of 296
92%
Householder approved
Above avg (90%) #153 of 296
73%
Decided in 8 weeks
Above avg (63%) #94 of 296
27%
Extended time limit
Below avg (41%) #40 of 296
63%
Minor dwellings approved
30 decided (1-9 homes)
67%
Major dwellings approved
9 decided (10+ homes)
91%
Change of use approved
11 decided
547
Total decisions
55 refused in the year to March 2026