Unit 1 Bankes Heath Industrial Park Wallisdown Road, Bournemouth BH11 8FG Data via plota.co.uk

P/26/02403/FUL - Full Planning Permission Awaiting sign off

Proposal

Change of use of industrial and/or warehousing unit to padel tennis facility (Class E (d)) with changing facilities, a cafe and lounge, pro-shop and associated management offices Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 May 2026
Decision
Target date was 17 Jul 2026

Under consideration

No decision has been issued yet. Plota predicted a decision soon after comments close on 27 Aug 2026; it is now day 159.

The consultation period closed on 27 Aug 2026.

Documents 26

All documents on the council site ↗

Site constraints 5

Public footpath about 15 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
SSSI about 111 m away: Turbary and Kinson Commons SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Also on the record
Local nature reserve about 496 m away: Kinson Common; Inside the Bournemouth built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in BCP - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
BCP
Application type
Full Planning Permission
Postcode
BH11 8FG
Received
22 May 2026
Validated
22 May 2026
Ward
Kinson
Parish
Bournemouth Town Council
Case officer
Show
Decision level
Delegated
Applicant
Show
Agent
Chapman Lily Planning Ltd

Decision outlook

Day 159, past the statutory target. 80% of changes of use in BCP are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 25 Oct 2026.

Day 159103 days past the 56-day target
51%decided within 8 weeks
74%approved
123decided in the last year

Plota live figures for changes of use decided by BCP in the last twelve months, from validation. BCP decision record →

Public comments

5comments received
4 objecting1 supporting

80% object · above the UK average of 74%

Last counted 25 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Consultation
4 Jun 2026
Comments by
27 Aug 2026
BCP
Planning Authority Score
1.7/10
Poor
#279 of 296 councils
Relevant to this application:
Change of use

BCP is slower than most councils at deciding householder applications, ranking #256 out of 296. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly less likely to be approved here (88%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
BCP decision statistics
Based on MHCLG data, the year to March 2026
83%
Overall approval rate
Below avg (87%) #233 of 296
88%
Householder approved
Below avg (90%) #214 of 296
44%
Decided in 8 weeks
Below avg (63%) #256 of 296
60%
Extended time limit
Above avg (41%) #267 of 296
67%
Minor dwellings approved
346 decided (1-9 homes)
68%
Major dwellings approved
56 decided (10+ homes)
81%
Change of use approved
78 decided
2,244
Total decisions
392 refused in the year to March 2026