Woodyhyde The Glen Uplyme Lyme Regis DT7 3TR Data via plota.co.uk

26/0937/FUL - Full Application Approved

Proposal

Raise roof and erect single storey extensions to east, west and south of existing building. Resiting of pedestrian entrance and installation of new raised decking. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 May 2026
✓
Approved
7 Aug 2026

Approved on 7 Aug 2026 · Delegated Decision · Last checked 13 Aug 2026

Site constraints 8

East Devon National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Public footpath 11 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Radon affected area, class 4; 6 listed buildings within 150 m; Inside the Uplyme built-up area; Priority habitat 12 m away: Deciduous woodland; Flood defence 44 m away (natural high ground, designed for a 1 in 100 year flood).
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 3

Last sold for £290,000 in July 2020. Detached house, freehold.

23 July 2020£290,000
31 January 2019£250,000
21 July 1995£60,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Building

Floor area77 m² (829 sq ft)
Energy ratingD (60 out of 100), could reach B
PropertyDetached bungalow, 3 habitable rooms
Built1900 to 1929
HeatingBoiler and radiators, mains gas
WallsCavity wall, as built, no insulation (assumed)

From the energy performance certificate lodged in May 2018, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in East Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
East Devon
Application type
Full Application
Postcode
DT7 3TR
Received
19 May 2026
Validated
19 May 2026
Ward
Trinity
Parish
Uplyme
Target decision
7 Aug 2026
Decision
Approval with conditions
Decision date
7 Aug 2026
Decision level
Delegated Decision
Applicant
Show
Agent
RAK ARCHITECTURE

How this decision compares

Decided in 80 days from validation, 32 days slower than East Devon's median of 48 for extensions. Approved, as 95% of extensions here are.

74%decided within 8 weeks
95%approved
567decided in the last year

Plota live figures for extensions decided by East Devon in the last twelve months, from validation. East Devon decision record →

Public comments

1comment received
1 neutral

5 neighbours consulted · Last counted 13 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14929541
Planning Portal ref
PP-14929541
Env. assessment
No
East Devon
Planning Authority Score
6.7/10
Good
#72 of 296 councils
Relevant to this application:
Householder decisions

East Devon ranks #103 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Devon decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #152 of 296
94%
Householder approved
Above avg (90%) #104 of 296
72%
Decided in 8 weeks
Above avg (63%) #103 of 296
34%
Extended time limit
Below avg (41%) #86 of 296
63%
Minor dwellings approved
168 decided (1-9 homes)
74%
Major dwellings approved
23 decided (10+ homes)
88%
Change of use approved
25 decided
1,321
Total decisions
157 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.

Freehold boundary: © Crown copyright and database rights 2026, HM Land Registry. Polygons © Crown copyright and database rights 2026 Ordnance Survey 100026316. Conditions of use

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.