Proposed Sub Station King Georges Avenue Leiston Suffolk Data via plota.co.uk

DC/26/3718/CON - Other Consultation Awaiting decision

Proposal

Consultation - The installation of a substation within a land plot of 3m x 3m Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Oct 2026
Decision
Expected by 12 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 17 Dec 2026 and 24 Dec 2026, from East Suffolk's recent utility and infrastructure works.

Site constraints 6

Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s) agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 74 m away: East Anglia ONE North Offshore Windfarm
The site is 74 m from the project boundary. Generating station, decided. The project page says whether consent was granted. Also within 2 km: East Anglia TWO Offshore Windfarm (decided, 74 m); The Sizewell C Project (decided, 84 m); Galloper Offshore Wind Farm (decided, 561 m); Suffolk Water Recycling Transfer and Storage (at pre-application, 1869 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
National landscape 84 m away: Suffolk Coast & Heaths
Outside the landscape; its setting can still be raised.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Also on the record
Special protection area 457 m away: Sandlings; SSSI 457 m away: Leiston - Aldeburgh SSSI.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 24 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Suffolk - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Other Consultation
Received
22 Oct 2026
Validated
22 Oct 2026
Ward
Aldeburgh And Leiston
Parish
Leiston Cum Sizewell
Case officer
Show
Target decision
12 Nov 2026
Applicant
Show

Decision outlook

Day 6 of the 56-day target. East Suffolk usually decides utility and infrastructure works by day 56.

Day 650 days to the 56-day target
51%decided within 8 weeks
100%approved
13%go to committee

Plota live figures for utility and infrastructure works decided by East Suffolk in the last twelve months, from validation. East Suffolk decision record →

Public comments

No public comments yet.

Last counted 24 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
12 Nov 2026
Env. assessment
No
East Suffolk
Planning Authority Score
5.3/10
Average
#129 of 296 councils
Relevant to this application:
Householder decisions

East Suffolk ranks #183 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Suffolk decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #81 of 296
95%
Householder approved
Above avg (90%) #76 of 296
60%
Decided in 8 weeks
Below avg (63%) #183 of 296
42%
Extended time limit
Above avg (41%) #162 of 296
80%
Minor dwellings approved
212 decided (1-9 homes)
100%
Major dwellings approved
19 decided (10+ homes)
81%
Change of use approved
139 decided
1,965
Total decisions
158 refused in the year to March 2026