Former Wilderspool Stadium Site, Warrington Data via plota.co.uk

2025/01228/DISCON - Discharge of Condition Pending Consideration

Proposal

Discharge of Conditions 8(Phasing Plan), 9(Existing Drainage Plan), 13(Geonvironmental Site Assessment), 15(Timetable for Implementation), 16(Highways Design & Construction), 18(Design & Construction of the Site Access Points), 22(Highways & Environmental Management Plan). 31(Local Employment Scheme), 32(Openreach Plan), 33(Cadent Gas Point of Connection/Sp Energy and United Utilities), 35(Landscaping Plan BNG) on previous application . Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
1 Sept 2025
Decision
Target date was 27 Oct 2025

Under consideration

No decision has been issued yet. A decision is expected by 27 Oct 2025.

The consultation period closed on 13 May 2026.

Documents 65

Plans & drawings 38

PDF Condition 13 - Ground Gas Addendum Environmental Reports/Plans · 23 Apr 2026 View ↗ PDF Maintenance Plan - Condition 9 Amended Plans/Documents · 27 Mar 2026 View ↗ PDF GI Extract - Condition 9 Amended Plans/Documents · 27 Mar 2026 View ↗ PDF CHEMP - Condition 22 Amended Plans/Documents · 27 Mar 2026 View ↗ PDF Proposed Landscaping Plan - Condition 35 Amended Plans/Documents · 27 Mar 2026 View ↗ PDF Proposed Phasing Plan - Condition 8 & 15 Amended Plans/Documents · 27 Mar 2026 View ↗ PDF Proposed Easement - Condition 9 Amended Plans/Documents · 27 Mar 2026 View ↗ PDF Highway Boundaries & Visibility Splays - Condition 16 Amended Plans/Documents · 27 Mar 2026 View ↗ PDF Ground Gas Addendum Amended Plans/Documents · 9 Dec 2025 View ↗ PDF Landscape Plan Proposed Plans · 1 Sept 2025 View ↗ PDF United Utilities plan Supporting/Supplementary Info · 1 Sept 2025 View ↗ PDF Cadent Gas Drawing Supporting/Supplementary Info · 1 Sept 2025 View ↗ PDF Openreach Plan Supporting/Supplementary Info · 1 Sept 2025 View ↗ PDF Construction Highways Environmental Management Plan Highways Reports/Plans · 1 Sept 2025 View ↗ PDF 0704-P01 Proposed Plans · 1 Sept 2025 View ↗ PDF 0703-P01 Proposed Plans · 1 Sept 2025 View ↗ PDF 0701b-P01 Proposed Plans · 1 Sept 2025 View ↗ PDF 0701a-P01 Proposed Plans · 1 Sept 2025 View ↗ PDF 0203b-P01 Proposed Plans · 1 Sept 2025 View ↗ PDF 0203a-P01 Proposed Plans · 1 Sept 2025 View ↗ PDF 0202-P01 Proposed Plans · 1 Sept 2025 View ↗ PDF 0201b-P01 Proposed Plans · 1 Sept 2025 View ↗ PDF 0201a-P01 Proposed Plans · 1 Sept 2025 View ↗ PDF 0201-P02 Proposed Plans · 1 Sept 2025 View ↗ PDF 0702b-P01 Proposed Plans · 1 Sept 2025 View ↗ PDF 0702a-P01 Proposed Plans · 1 Sept 2025 View ↗ PDF P01 - 278 RM CD Proposed Plans · 1 Sept 2025 View ↗ PDF P01 - 278 SC PC Proposed Plans · 1 Sept 2025 View ↗ PDF P01 - 278 GA LB Proposed Plans · 1 Sept 2025 View ↗ PDF P01 Construction Details 2 Proposed Plans · 1 Sept 2025 View ↗ PDF P01 Construction Details 1 Proposed Plans · 1 Sept 2025 View ↗ PDF P01 SW Manhole Schedule 3 Proposed Plans · 1 Sept 2025 View ↗ PDF P01 SW Manhole Schedule 2 Proposed Plans · 1 Sept 2025 View ↗ PDF P01 SW Manhole Schedule 1 Proposed Plans · 1 Sept 2025 View ↗ PDF P01 Foul Manhole Schedule 3 Proposed Plans · 1 Sept 2025 View ↗ PDF P01 Foul Manhole Schedule 2 Proposed Plans · 1 Sept 2025 View ↗ PDF P01 Foul Manhole Schedule 1 Proposed Plans · 1 Sept 2025 View ↗ PDF Phasing Plan Proposed Plans · 1 Sept 2025 View ↗

All documents on the council site ↗

Site constraints 3

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Also on the record
Nature recovery project: Lost Wetlands; Inside the Warrington built-up area.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 17 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Warrington - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Warrington
Application type
Discharge of Condition
Received
1 Sept 2025
Validated
1 Sept 2025
Ward
Latchford West
Case officer
Show
Target decision
27 Oct 2025
Decision level
Delegated decision
Applicant
Show
Agent
Grimster Planning Ltd

Consultation & key dates

Comments by
13 May 2026
Statutory expiry
27 Oct 2025
Warrington
Planning Authority Score
5.5/10
Average
#122 of 296 councils
Relevant to this application:
Householder decisions

Warrington is faster than most councils at deciding householder applications, ranking #72 out of 296. Only 29% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Warrington is also one of the strictest councils - it refuses more householder applications than almost any other, with only 80% approved vs 90% nationally.

One of the strictest councils
only 80% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Warrington decision statistics
Based on MHCLG data, the year to March 2026
79%
Overall approval rate
Below avg (87%) #267 of 296
80%
Householder approved
Below avg (90%) #279 of 296
76%
Decided in 8 weeks
Above avg (63%) #72 of 296
29%
Extended time limit
Below avg (41%) #51 of 296
71%
Minor dwellings approved
77 decided (1-9 homes)
91%
Major dwellings approved
11 decided (10+ homes)
71%
Change of use approved
45 decided
883
Total decisions
188 refused in the year to March 2026