Land at Littleborough Lane, Marton, Gainsborough, DN22 0HD Data via plota.co.uk

WL/2026/00921 - Telecomms Determin. - 28 days Live

Proposal

The Electronic Communications Code (Conditions and restrictions) Regulations 2003 (as amended) – Regulation 5 Notice of Intention to Install Fixed Line Broadband Apparatus - for 1no. wooden pole. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
6 Oct 2026
Decision
Expected by 3 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 1 Nov 2026, from West Lindsey's recent utility and infrastructure works.

Site constraints 6

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Public footpath 15 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
National infrastructure project 303 m away: Steeple Renewables Project
The site is 303 m from the project boundary. Generating station, awaiting the Secretary of State's decision. Also within 2 km: Gate Burton Energy Park (decided, 961 m); West Burton Solar Project (decided, 1276 m); Tillbridge Solar Project (decided, 1396 m); Cottam Solar Project (decided, 1398 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Flood defence 2 m away (embankment, designed for a 1 in 5 year flood); Scheduled monument 219 m away: Segelocum Roman town; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Not green belt · No listed building at the site

Checked on 8 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in West Lindsey - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Telecomms Determin. - 28 days
Postcode
DN22 0HD
Received
6 Oct 2026
Validated
6 Oct 2026
Ward
TORKSEY
Parish
Marton CP
Case officer
Show
Target decision
3 Nov 2026
Decision level
Delegated
Applicant
Show

Decision outlook

Day 4 of the 56-day target. West Lindsey usually decides utility and infrastructure works by day 26.

Day 452 days to the 56-day target
96%decided within 8 weeks
100%approved
31decided in the last year

Plota live figures for utility and infrastructure works decided by West Lindsey in the last twelve months, from validation. West Lindsey decision record →

Consultation & key dates

Alt. reference
EC/2026/00965
Committee
7 Oct 2026
Statutory expiry
3 Nov 2026
Env. assessment
No
West Lindsey
Planning Authority Score
5.3/10
Average
#134 of 296 councils
Relevant to this application:
Householder decisions

West Lindsey ranks #110 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
West Lindsey decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #70 of 296
94%
Householder approved
Above avg (90%) #123 of 296
72%
Decided in 8 weeks
Above avg (63%) #110 of 296
44%
Extended time limit
Above avg (41%) #187 of 296
88%
Minor dwellings approved
80 decided (1-9 homes)
100%
Major dwellings approved
25 decided (10+ homes)
94%
Change of use approved
33 decided
562
Total decisions
39 refused in the year to March 2026