100 metres North East of 5 Tullydonnell Road, Silverbridge, BT35 9LU Data via plota.co.uk

LA07/2026/1300/O - Outline Valid

Proposal

Replacement dwelling and garage with existing dwelling to be retained Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Oct 2026
✓
Validated
23 Oct 2026
Decision
Expected by 18 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 18 Dec 2026 and 16 Jan 2027, from recent outline applications across the UK.

Comments are open until 18 Nov 2026

Comment on this application ↗

Site constraints 1

Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 24 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newry Mourne Down - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Outline
Postcode
BT35 9LU
Received
22 Oct 2026
Validated
23 Oct 2026
Ward
Mullaghbane
Applicant
Show
Agent
James A Murphy, Chartered Engineer

Decision outlook

Day 5 of the 56-day target. Councils usually decide outline applications by day 67.

Day 562 days to the predicted decision (day 67)
42%decided within 8 weeks
59%approved
12%go to committee

Plota live figures for outline applications decided across the UK in the last twelve months, from validation; too few recent outline applications in Newry Mourne Down to go on. Newry Mourne Down decision record →

Consultation & key dates

Planning Portal ref
PP-15316221
Comments by
18 Nov 2026
Site or press notice
4 Nov 2026