Horley Bowling Club Bowling Green Horley Recreation Ground Brighton Road Horley Surrey RH6 8DA Data via plota.co.uk

Proposal

Relocation and replacement of the existing storage shed within the grounds of Horley Bowling Club comprising the installation of two new timber storage sheds and associated bases. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 16 Oct 2026
✓
Consultation
22 Oct 2026
Decision
Expected by 11 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision between 11 Dec 2026 and 4 Jan 2027, from Reigate's recent commercial and major works.

Comments are open until 12 Nov 2026

Comment on this application ↗

Site constraints 3

National infrastructure project 801 m away: Gatwick Airport Northern Runway
The site is 801 m from the project boundary. Airport, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
1 listed building within 150 m
Nearest: Horley War Memorial, Grade II, 50 m away
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Also on the record
Inside the Horley (Reigate and Banstead) built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 23 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Reigate - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Reigate
Application type
Full planning
Postcode
RH6 8DA
Received
around 16 Oct 2026
Validated
16 Oct 2026
Ward
Horley West And Sidlow
Parish
Horley Town Council
Case officer
Show
Target decision
11 Dec 2026
Decision level
Principal Planning Officer
Applicant
Show

Decision outlook

Day 12 of the 56-day target. Reigate usually decides commercial and major works by day 67.

Day 1255 days to the predicted decision (day 67)
45%decided within 8 weeks
95%approved
7%go to committee

Plota live figures for commercial and major works decided by Reigate in the last twelve months, from validation. Reigate decision record →

Public comments

No public comments yet.

17 neighbours consulted · Last counted 23 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15212634
Planning Portal ref
PP-15212634
Neighbours
22 Oct 2026
Consultation
22 Oct 2026
Comments by
12 Nov 2026
Statutory expiry
11 Dec 2026
Reigate
Planning Authority Score
7.3/10
Good
#52 of 296 councils
Relevant to this application:
Householder decisions

Reigate is faster than most councils at deciding householder applications, ranking #70 out of 296. Only 26% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Reigate decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #160 of 296
93%
Householder approved
Above avg (90%) #135 of 296
76%
Decided in 8 weeks
Above avg (63%) #70 of 296
26%
Extended time limit
Below avg (41%) #35 of 296
71%
Minor dwellings approved
110 decided (1-9 homes)
90%
Major dwellings approved
10 decided (10+ homes)
74%
Change of use approved
31 decided
981
Total decisions
116 refused in the year to March 2026