Siemens Sir William Siemens Square Frimley Camberley Surrey GU16 8QD Data via plota.co.uk

25/1222/NMA - Non Material Amendment Approved

Proposal

Application under S96a (non-material amendment) to application ref for an alteration to the site layout resulting in the relocation of the bin collection point. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
25 Nov 2025
✓
Approved
17 Dec 2025

Approved on 17 Dec 2025 · Delegated Decision · Last checked 9 Oct 2026

Associated applications 4

Site constraints 2

National infrastructure project 847 m away: Southampton to London Pipeline Project
The site is 847 m from the project boundary. Pipeline, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the Frimley built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 9 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Surrey Heath - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Non Material Amendment
Postcode
GU16 8QD
Received
25 Nov 2025
Validated
25 Nov 2025
Ward
Frimley
Case officer
Show
Target decision
23 Dec 2025
Decision
Grant
Decision date
17 Dec 2025
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 22 days from validation, 28 days faster than Surrey Heath's median of 50 for amendments. Approved, as 87% of amendments here are.

69%decided within 8 weeks
87%approved
93decided in the last year

Plota live figures for amendments decided by Surrey Heath in the last twelve months, from validation. Surrey Heath decision record →

Public comments

No public comments yet.

Last counted 9 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14504150
Planning Portal ref
PP-14504150
Statutory expiry
23 Dec 2025
Env. assessment
No
Surrey Heath
Planning Authority Score
4.8/10
Below average
#163 of 296 councils
Relevant to this application:
Householder decisions

Surrey Heath ranks #134 out of 296 councils for householder decision speed. Householder applications are slightly less likely to be approved here (87%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Surrey Heath decision statistics
Based on MHCLG data, the year to March 2026
87%
Overall approval rate
Above avg (87%) #182 of 296
87%
Householder approved
Below avg (90%) #235 of 296
68%
Decided in 8 weeks
Above avg (63%) #134 of 296
34%
Extended time limit
Below avg (41%) #94 of 296
74%
Minor dwellings approved
39 decided (1-9 homes)
86%
Major dwellings approved
7 decided (10+ homes)
95%
Change of use approved
20 decided
600
Total decisions
78 refused in the year to March 2026