2 Paradise Place Goole East Riding Of Yorkshire DN14 5DL Data via plota.co.uk

26/02282/PLF - Full Planning Permission Pending Decision

Proposal

Change of use at second floor from office space to residential apartment with installation of replacement windows Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
26 Aug 2026
✓
Validated
3 Sept 2026
Decision
Expected by 29 Oct 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 28 Oct 2026, from East Riding's recent changes of use.

The consultation period closed on 7 Oct 2026.

Site constraints 10

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Conservation area about 5 m away: Goole Town
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Also on the record
Heritage at risk about 5 m away: Goole, East Riding of Yorkshire; 2 listed buildings within 150 m of the postcode pin; Nature improvement area: Humberhead Levels; Special area of conservation about 459 m away: Humber Estuary; Coalfield, development low risk area; SSSI about 459 m away: Humber Estuary - 2000480 SSSI; National infrastructure project about 932 m away: Humber Carbon Capture Pipeline, at pre-application; Inside the Goole built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Riding - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission
Postcode
DN14 5DL
Received
26 Aug 2026
Validated
3 Sept 2026
Ward
Goole South
Parish
Goole Town Council
Case officer
Show
Target decision
29 Oct 2026
Applicant
Show
Agent
AEB Architecture And Design Ltd

Decision outlook

Day 55 of the 56-day target. East Riding usually decides changes of use by day 55.

Day 551 days to the 56-day target
85%decided within 8 weeks
77%approved
165decided in the last year

Plota live figures for changes of use decided by East Riding in the last twelve months, from validation. East Riding decision record →

Public comments

No public comments yet.

Last counted 27 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PLP-00005536
Comments by
7 Oct 2026
Env. assessment
No
East Riding
Planning Authority Score
8.1/10
Excellent
#24 of 296 councils
Relevant to this application:
Change of use

East Riding is one of the fastest councils in England for householder decisions, ranking #7 out of 296. Only 14% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Among the fastest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
East Riding decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #110 of 296
92%
Householder approved
Above avg (90%) #152 of 296
95%
Decided in 8 weeks
Above avg (63%) #7 of 296
14%
Extended time limit
Below avg (41%) #9 of 296
76%
Minor dwellings approved
190 decided (1-9 homes)
95%
Major dwellings approved
42 decided (10+ homes)
86%
Change of use approved
79 decided
1,887
Total decisions
198 refused in the year to March 2026