Land of Joy Buddhist Retreat Centre, Greenhaugh Hall, Tarset, Hexham, Northumberland, NE48 1PP Data via plota.co.uk

Pending 25NP0048
Postcode
NE48 1PP

Description

Erection of two additional retreat huts Data via plota.co.uk

Last checked

Decision outlook

Northumberland (Park) decides full applications in a median of 56 days from validation.

56%decided within 8 weeks
87%approved
96,673decided in the last year

Plota live figures for full applications decided across the UK in the last twelve months, from validation; too few recent full applications in Northumberland (Park) to go on. Northumberland (Park) decision record →

Site constraints 7

Northumberland National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 5. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Special area of conservation about 88 m away: North Pennine Dales Meadows
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI about 88 m away: Greenhaugh Meadow SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Other Priority Habitats - NEZ
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Coalfield, development low risk area; Priority habitat about 12 m away: Deciduous woodland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Northumberland (Park) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Northumberland (Park)
Planning Authority Score
5.9/10
Average
#107 of 296 councils
Relevant to this application:
Householder decisions

Northumberland (Park) is faster than most councils at deciding householder applications, ranking #78 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Northumberland (Park) decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #114 of 296
92%
Householder approved
Above avg (90%) #161 of 296
75%
Decided in 8 weeks
Above avg (63%) #78 of 296
38%
Extended time limit
Below avg (41%) #131 of 296
100%
Minor dwellings approved
7 decided (1-9 homes)
75%
Change of use approved
4 decided
39
Total decisions
4 refused in the year to March 2026