Land To The South Of Island Road (A28), The Remaining Land Of The Former Chislet Colliery, Hersden. Data via plota.co.uk

CA/26/00795 - SOD Planning Permission Approved

Proposal

Details submitted pursuant to condition 4 (archaeological watching brief) of planning permission Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 May 2026
✓
Approved
15 May 2026

Approved on 15 May 2026 · Delegated Decision · Last checked 5 Jul 2026

Associated applications 3

  • Part of

    FullApprovedcouncil archive

    Conditions 4 discharged

Site constraints 5

Nutrient neutrality catchment: Stodmarsh SAC/SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
National infrastructure project about 410 m away: Richborough Connection Project
The site is about 410 m from the project boundary. Electricity line, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Coalfield, development low risk area; Inside the Hersden built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Canterbury - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Canterbury
Application type
SOD Planning Permission
Postcode
CT3 4HX
Received
12 May 2026
Validated
12 May 2026
Ward
Sturry
Parish
Hersden
Case officer
Show
Target decision
7 Jul 2026
Decision
Approved
Decision date
15 May 2026
Decision level
Delegated Decision
Agent
Pegasus Group

Consultation & key dates

Statutory expiry
7 Jul 2026
Canterbury
Planning Authority Score
4.8/10
Below average
#158 of 296 councils
Relevant to this application:
Householder decisions

Canterbury is slower than most councils at deciding householder applications, ranking #259 out of 296. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Canterbury decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #18 of 296
97%
Householder approved
Above avg (90%) #27 of 296
43%
Decided in 8 weeks
Below avg (63%) #259 of 296
44%
Extended time limit
Above avg (41%) #176 of 296
84%
Minor dwellings approved
62 decided (1-9 homes)
95%
Major dwellings approved
20 decided (10+ homes)
93%
Change of use approved
29 decided
925
Total decisions
45 refused in the year to March 2026