Phase 2 And 3a Of Eastern Green Urban Extension, South Of A45, Coventry, CV5 7LG

Pending PL/2026/0000706/NMA - NMA Non-material amendment of an existing planning permission
Council
Date received
30 Apr 2026
Postcode
CV5 7LG
Type
NMA Non-material amendment of an existing planning permission

Description

Non-material amendment (change plots 446 & 447 from Ellerton semi-detached house types to Maidstone semi-detached house types. Change plots 456 & 457 from Maidstone semi-detached to Ellerton semi-detached, reposition plot 455 and addition twin garage for plots 455 & 456) to application PL/2025/0002094/RVC granted on 23/03/2026 for Reserved Matters application for the construction of 491 dwellings, including appearance, layout, scale, landscaping, along with associated infrastructure to application OUT/2018/3225 granted 20/11/2018 for Residential led development of up to 2400 dwellings, Including 'extra-care' accommodation; new vehicular access from the A45 and via Pickford Green Lane, with other non-vehicular access points; 15ha of employment land (B1, B2 and B8); a District Centre of approximately 10,000 sq.m. retail space; a Local Centre of approx.1000 sq.m. local convenience retail plus other community facilities; provision of a Primary School; open spaces, substantial landscaping, green infrastructure and sports provision; earthworks including the provision of new drainage features; and associated demolition and groundworks. (Variation of condition No. 1 (approved drawings) to allow for brick changes, house type substitutions change to overhang on certain plots and layout changes per plot; imposed on planning permission reference PL/2025/0001329/RVC granted on 19/12/2025).

8/10
Planning Authority Score
#16 of 282

Coventry is one of the fastest councils in England for householder decisions, ranking #12 out of 282. Only 11% of applications have the time limit extended, well below the 40% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (91%) than the national average (90%).

Coventry decision performance
Based on MHCLG data, 2025
86%
Overall approval rate
Below avg (87%) #183 of 282
91%
Householder approved
Above avg (90%) #159 of 282
101%
Decided in 8 weeks
Above avg (71%) #12 of 282
11%
Extended time limit
Below avg (40%) #4 of 282
79%
Minor dwellings approved
145 decided (1-9 homes)
86%
Major dwellings approved
21 decided (10+ homes)
75%
Change of use approved
96 decided
1,226
Total decisions
176 refused in 2025