Rosendale Road, Between Norwood Road And Tritton Road London SE24
Description
Screening Opinion in respect of an Environmental Impact Assessment (EIA) pursuant to Regulation 6 of the Town and Country Planning (Environmental Impact Assessment) Regulations, 2017 for the creation of a cycle lane, along with changes to junction geometry, footways, signage, vehicle and cycle parking and other associated works to the highway along Rosendale Road, as Phase 3 of the Brockwell Park to Gipsy Hill Healthy Route between the A205 South Circular and Park Hall Road (following and connecting to the Phase 1 and Phase 2 two-way cycle tracks installed along the eastern side of Rosendale).
Lambeth ranks #131 out of 282 councils for householder decision speed. 46% of applications have the time limit extended, above the 40% national average. Lambeth is also one of the strictest councils - it refuses more householder applications than almost any other, with only 83% approved vs 90% nationally.
Nearby applications
23 Chalford Road London SE21 8BX
Application for a Certificate of Lawful Development (Proposed) with respect to t...
25 Alleyn Road London Southwark SE21 8AB
Works to a tree with a TPO: T1 & T2 - Lime Trees, to re-pollard at previous prun...
19 St Louis Road London SE27 9QN
Erection of a ground and 1st floor side infill extension and rear extension, tog...
131 South Croxted Road London SE21 8AX
Approval of details pursuant to conditions 4(Arboricultural Method Statement) an...
48 Auckland Hill London SE27 9QQ
Application for Certificate of Lawfulness (Proposed) with respect to the erectio...
34 Alleyn Road London Southwark SE21 8AL
Variation of Conditions 1 (approved plans) pursuant to planning permission 24/AP...