Land to the south of The Causeway, Mark, Highbridge, Somerset, TA9 Data via plota.co.uk

33/26/00005 - Outline Planning Permission Approved

Proposal

Outline application with some matters reserved, for the erection of 2 No. self build dwellings, requesting consideration of access. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Apr 2026
✓
Approved
7 Oct 2026

Approved on 7 Oct 2026 · Last checked 11 Oct 2026

Site constraints 10

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Priority habitat: No main habitat but additional habitats present
A habitat of principal importance. It shapes the ecology work and the biodiversity net gain a scheme has to show.
Public footpath about 17 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
National infrastructure project about 380 m away: Hinkley Point C Connection
The site is about 380 m from the project boundary. Electricity line, decided. The project page says whether consent was granted. Also within 2 km: Hinkley Point C Connection Project Material Change (at pre-application, about 376 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Nature recovery project: Somerset Coast, Levels and Moors; Radon affected area, class 2; 2 listed buildings within 150 m of the postcode pin; Inside the Mark built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Sedgemoor - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Sedgemoor
Application type
Outline Planning Permission
Postcode
TA9 4QQ
Received
22 Apr 2026
Validated
22 Apr 2026
Parish
Mark
Case officer
Show
Decision
Granted Permission
Decision date
7 Oct 2026
Applicant
Show
Agent
Salmon Planning Company, 2 Priory Road

How this decision compares

Decided in 168 days from validation, 102 days slower than Sedgemoor's median of 66 for new homes. Approved, as 81% of new homes here are.

42%decided within 8 weeks
81%approved
109decided in the last year

Plota live figures for new homes decided by Sedgemoor in the last twelve months, from validation. Sedgemoor decision record →

Consultation & key dates

Consultation
24 Apr 2026
Comments by
6 Jun 2026