Shell Bay Car Park, Ferry Road, Studland Data via plota.co.uk

P/FUL/2026/02125 - Full Planning Application Approved

Proposal

Installation of 1 x (black in colour) Solar payment contactless & coin terminal, 1860mm in height, 470mm in width (at its widest point) and 470mm in depth (at its widest point) (4G data connection), with the installation of a conversion plate;, Installation of 2 x Dual Lane Automatic Numberplate Recognition (ANPR) cameras bracket mounted onto the car park entrance cabin, both facing out of the car park; Installation of 1 x National Trust non-illuminated welcome sign post, at a height of 1.7m, a width of 0.1m, and a length of 0.3m; and Installation of 1 x National Trust, non-illuminated information sign post, at a height of 1.6m, width of 0.1m, and a length of 0.3m. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
20 Apr 2026
✓
Approved
12 Jun 2026

Approved on 12 Jun 2026 · Delegated · Last checked 12 Jul 2026

Documents 19

All documents on the council site ↗

Site constraints 11

National nature reserve: Purbeck Heaths
Internationally or nationally protected for its wildlife. A habitats assessment is needed.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: Poole Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Dorset National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Open access land
Open country or registered common land, with a right to roam on foot.
Building on registered common land needs the consent of the Secretary of State as well as planning permission.
Heritage coast: Purbeck
A defined stretch of undeveloped coastline.
Development inconsistent with keeping the coast undeveloped is resisted.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 5. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
SSSI 16 m away: Studland Cliffs SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Lowland fens
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Nature improvement area: Wild Purbeck; Priority habitat 15 m away: Coastal sand dunes,Lowland fens.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Dorset - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Dorset
Application type
Full Planning Application
Postcode
BH19 3BA
Received
20 Apr 2026
Validated
20 Apr 2026
Ward
South East Purbeck Ward
Parish
Studland
Case officer
Show
Decision
Granted
Decision date
12 Jun 2026
Decision level
Delegated

How this decision compares

Decided in 53 days from validation, about the council's usual 51 days. Approved, as 98% of signs and adverts here are.

73%decided within 8 weeks
98%approved
59decided in the last year

Plota live figures for signs and adverts decided by Dorset in the last twelve months, from validation. Dorset decision record →

Consultation & key dates

Comments by
4 Jun 2026
Dorset
Planning Authority Score
7.5/10
Good
#44 of 296 councils
Relevant to this application:
Householder decisions

Dorset is faster than most councils at deciding householder applications, ranking #51 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Dorset decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #80 of 296
95%
Householder approved
Above avg (90%) #74 of 296
78%
Decided in 8 weeks
Above avg (63%) #51 of 296
35%
Extended time limit
Below avg (41%) #102 of 296
81%
Minor dwellings approved
344 decided (1-9 homes)
85%
Major dwellings approved
40 decided (10+ homes)
76%
Change of use approved
85 decided
2,781
Total decisions
233 refused in the year to March 2026