15-35 Notting Hill Gate, London, W11 3JQ Data via plota.co.uk

PP/26/01685 - Planning Permission Approved

Proposal

Replacement of external facades; ground floor works including provision of new office entrance and bin and cycle store; creation of rooftop terrace areas, new plant enclosure; extension to stair core; and associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
9 Mar 2026
✓
Approved
10 Sept 2026

Approved on 10 Sept 2026 · Last checked 21 Oct 2026

Planning committee

Decided by Kensington and Chelsea Planning Applications Committee on 8 Sept 2026.

Approved unanimously

As officers recommended.

  • Officers advised approval because the refurbishment and public realm works would improve the building without unacceptable effects on neighbours or highways.
  • Five organisations objected, raising concerns about materials, terrace hours, landscaping, plant equipment and lighting.
  • The committee unanimously granted planning permission with an amended condition, an additional informative and the recommended conditions.
Read how the committee decided The proposed works, site history, officers’ assessment, objections, committee discussion, vote and decision.

Source: Plota analysis of Kensington and Chelsea's committee minutes of 8 Sept 2026.

Licences at this address

  • Licence Eat Tokyo Premises licence · in force since 9 Mar 2009 · elsewhere in the building Licensed hours: alcohol until midnight (Thu-Sat 01:00)
    Food hygiene rating: 5 (Very good)Inspected 15 Jul 2025
  • Licence Notting Hill Arts Club Premises licence · in force since 9 Jul 2005 · elsewhere in the building Licensed hours: alcohol Tue-Sat until 02:00, Sun until 00:30
    Food hygiene rating: 5 (Very good)Inspected 18 Jan 2024

Licensed hours are what the licence permits, not opening times.

Site constraints 12

2 Article 4 directions
Article 4 - No 100 · Article 4 - No 106. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Archaeological priority area: The APA covers the high-ground of the gravel spur and slopes of Campden Hill
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Kensington and Chelsea AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: Notting Hill Gate
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Conservation area about 11 m away: Kensington Palace
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
12 listed buildings within 150 m of the postcode pin
Nearest: Mall Chambers, Grade II, about 43 m from the postcode pin · 1 Grade II*, 10 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 12 with distances
Historic England ↗
Also on the record
Tree preservation order about 11 m away; Registered park or garden about 220 m away: Kensington Gardens; Inside the Kensington and Chelsea built-up area; Public transport access: PTAL 6a (excellent), TfL 2023, for the 100 m square; National infrastructure project about 1925 m away: London Strategic Heat Main Project, at pre-application.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Kensington and Chelsea - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Planning Permission
Postcode
W11 3JQ
Received
9 Mar 2026
Validated
9 Mar 2026
Ward
Campden
Case officer
Show
Target decision
4 May 2026
Decision
Granted
Decision date
10 Sept 2026
Applicant
Show

How this decision compares

Decided in 185 days from validation, 105 days slower than Kensington and Chelsea's median of 80 for commercial and major works. Approved, as 87% of commercial and major works here are.

35%decided within 8 weeks
87%approved
77decided in the last year

Plota live figures for commercial and major works decided by Kensington and Chelsea in the last twelve months, from validation. Kensington and Chelsea decision record →

Consultation & key dates

Comments by
15 May 2026
Kensington and Chelsea
Planning Authority Score
5.1/10
Average
#144 of 296 councils
Relevant to this application:
Householder decisions

Kensington and Chelsea ranks #174 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Kensington and Chelsea decision statistics
Based on MHCLG data, the nine months to December 2025
93%
Overall approval rate
Above avg (87%) #58 of 296
94%
Householder approved
Above avg (90%) #110 of 296
61%
Decided in 8 weeks
Below avg (63%) #174 of 296
40%
Extended time limit
Below avg (41%) #152 of 296
94%
Minor dwellings approved
455 decided (1-9 homes)
87%
Change of use approved
53 decided
1,839
Total decisions
135 refused in the nine months to December 2025