Monkhouse Primary School Wallington Avenue Cullercoats Tyne And Wear NE30 3SH Data via plota.co.uk

26/00584/CLPROP - certificate of lawful proposed devel Approved

Proposal

Erecting of 2no. new street columns with post top circa 4m height. Installing 5no. external lights fixed to soffit and masonry to north west elevation of school Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
22 Apr 2026
✓
Approved
10 Jun 2026

Approved on 10 Jun 2026 · Delegated Decision · Last checked 5 Jul 2026

Site constraints 2

Coal mining development high risk area
Recorded coal mining features at or near the surface. Most planning applications here need a coal mining risk assessment. Nearest recorded mine shaft: about 35 m from the postcode pin (reference 435570-016).
From the Mining Remediation Authority, formerly the Coal Authority. The development high risk area marks recorded coal mining features at or near the surface: mine shafts and adits, shallow workings, mine gas and former opencast sites. Most planning applications there need a coal mining risk assessment; householder applications, changes of use and some minor works are exempt. Mine entry positions come from old plans and can be out by several metres, and unrecorded workings can exist anywhere in the coalfield.
Coal mining risk assessments ↗
Also on the record
Inside the Tynemouth built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in North Tyneside - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
certificate of lawful proposed devel
Postcode
NE30 3SH
Received
22 Apr 2026
Validated
22 Apr 2026
Ward
Tynemouth
Parish
North Shields
Case officer
Show
Target decision
17 Jun 2026
Decision
Application Permitted
Decision date
10 Jun 2026
Decision level
Delegated Decision
Applicant
Show
Agent
North Tyneside Council

How this decision compares

Decided in 49 days from validation, 32 days slower than North Tyneside's median of 17 for utility and infrastructure works. Approved, as 78% of utility and infrastructure works here are.

92%decided within 8 weeks
78%approved
138decided in the last year

Plota live figures for utility and infrastructure works decided by North Tyneside in the last twelve months, from validation. North Tyneside decision record →

Consultation & key dates

Alt. reference
PP-14862561
Planning Portal ref
PP-14862561
Statutory expiry
17 Jun 2026
Env. assessment
No
North Tyneside
Planning Authority Score
8.9/10
Excellent
#8 of 296 councils
Relevant to this application:
Householder decisions

North Tyneside is faster than most councils at deciding householder applications, ranking #35 out of 296. Only 25% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
North Tyneside decision statistics
Based on MHCLG data, the year to March 2026
97%
Overall approval rate
Above avg (87%) #5 of 296
97%
Householder approved
Above avg (90%) #36 of 296
81%
Decided in 8 weeks
Above avg (63%) #35 of 296
25%
Extended time limit
Below avg (41%) #31 of 296
100%
Minor dwellings approved
5 decided (1-9 homes)
83%
Major dwellings approved
6 decided (10+ homes)
91%
Change of use approved
56 decided
616
Total decisions
20 refused in the year to March 2026