1, Portal Way, LONDON, W3 6RS Data via plota.co.uk

26/0070/VAROPDC - Variation of conditions (Section 73 applications) Pending Consideration

Proposal

Section 73 application to vary conditions 6 (Detailed planning permission); 7 (Development of detailed element); 8 (Compliance with EIA mitigation); and 10 (Site wide quantum of development) of planning permission as amended by 25/0211/NMAOPDC for 'Hybrid planning application (part full/part outline) for the demolition of all buildings and phased redevelopment to provide up to seven buildings comprising a combination of: residential units (Class C3); office floorspace (Class E); a hotel (Class C1); co-living units (Sui Generis); student accommodation units (Sui Generis); flexible commercial/community/town centre uses (Classes E/F/sui generis); basements; back of house space; cycle and car parking; publicly accessible landscaped open space; highway works and public realm improvements.' The amendments primarily involve the change of use of Building E from residential (Class C3) to purpose built student accommodation (sui generis) to provide 1,350 student bedrooms; and alternative layouts for Building F to provide 576 student bedrooms with associated changes to the external appearance of the building. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
8 Apr 2026
✓
Validated
13 Apr 2026
✓
Consultation
28 Apr 2026
Decision
Target date was 2 Aug 2026

Under consideration

No decision has been issued yet. A decision is expected by 2 Aug 2026.

The consultation period closed on 29 May 2026.

Associated applications 6

Site constraints 5

Air quality management area: Ealing AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Opportunity area
Where the London Plan expects significant growth.
Boundaries are indicative and the borough holds the detailed plan.
Also on the record
National infrastructure project 1673 m away: Thames Tideway Tunnel; Inside the Ealing built-up area; Public transport access: PTAL 5 (very good), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Building

Floor area16,148 m² (173,815 sq ft)
Energy ratingD (asset rating 83)
UseOffices and Workshop Businesses
HeatingAir Conditioning

From the energy performance certificate lodged in July 2023, the latest held for this property. The building may have changed since. View the certificate

Work with planning data?

Every application in Old Oak Park Royal - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Variation of conditions (Section 73 applications)
Postcode
W3 6RS
Received
8 Apr 2026
Validated
13 Apr 2026
Case officer
Show
Target decision
2 Aug 2026
Decision level
Delegated to Director of Planning
Applicant
Show
Agent
Iceni Projects

Consultation & key dates

Alt. reference
PP-14790658
Comments by
29 May 2026
Site or press notice
29 Apr 2026
Statutory expiry
13 May 2026

Energy performance: Energy performance certificates from the Energy Performance of Buildings Register, Ministry of Housing, Communities and Local Government. Contains public sector information licensed under the Open Government Licence v3.0. © Crown copyright 2026.