Twyn Hywel Energy Park Land North-West Of Caerphilly Data via plota.co.uk
Proposal
Discharge condition 22 (Borrow pits) of planning consent (Vary condition 2 of (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with associated lay down areas near to the Site entrance; Habitat Management Area; and offsite works to facilitate the movement of abnormal loads such as the construction of over-run areas and temporary modifications to street furniture) to amend the approved plans to increase the rotor diameter of the wind turbines, increase the height of the on-site transformer, and enlarge the grid connection corridor) Data via plota.co.uk
Application progress
Decide Cond Discharge case on 29 Jun 2026 · Delegated · Last checked 5 Jul 2026
Documents 9
Decision & officer reports 3
Plans & drawings 1
Application forms 1
Consultation & comments 3
Other documents 1
Associated applications 11
Part of
Conditions 6, 13, 14, 15, 28 awaiting decision · 22, 25, 26, 30, 33, 39 decided (outcome not recorded)
- ConditionsDischarge condition 22 (Borrow pits) (Vary condition 2 (Construct and operate up to 14 wind…This application26/0279/COND
Show 9 more · 4 pending, 5 decided
Show 6 earlier · 2 pending, 4 decided
Every application in Caerphilly - and every UK council - as a live feed, an API, or a bulk CSV export.
Nearby new applications
Twyn Hywel Energy Park Land North-West Of Caerphilly
Seek approval of a non material amendment to planning consent 25/0342/NCC (Vary ...
Caerphilly Castle Castle Street Caerphilly CF83 1JD
Refurbish existing timber bridge to include demolition and replacement of parape...
Twyn Hywel Energy Park Land North-West Of Caerphilly
Discharge condition 06 (CEMP) of planning consent 25/0342/NCC (Vary condition 2 ...
1 Ludlow Street Caerphilly CF83 1GG
Convert existing garage to living accommodation (home/office) in the rear garden
Cadw The Grove Nantgarw Road Caerphilly CF83 3FB
Restore the building into a functioning regional base
Land 16km North Of Cardiff, On The Border Of Caerphilly And Rhondda Cynon Taf (on Mynydd Eglwysilan)
Discharge of Condition 13 (AIL) of planning permission 25/0619/RVOC.
Important details
- Council
- Caerphilly
- Application type
- Condition Discharge
- Postcode
- CF83 1JL
- Received
- 15 Apr 2026
- Validated
- 16 Apr 2026
- Ward
- Nelson
- Case officer
- Show
- Target decision
- 11 Jun 2026
- Decision
- Decide Cond Discharge case
- Decision date
- 29 Jun 2026
- Decision level
- Delegated
- Applicant
- Show
- Agent
- Savills
Consultation & key dates
- Consultation
- 21 Apr 2026
- Env. assessment
- No
Historical activity at this location
21 nearby applications on record - archival context, not part of the live application.
Nearby activity
Track this application
Twyn Hywel Energy Park Land North-West Of Caerphilly
Tracking this application
Not there in a minute? Check junk - especially Hotmail and Outlook.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
Check your email
Referenced application
Council archive
Twyn Hywel Energy Park Land North-West Of Caerphilly
Vary condition 2 of 23/0427/DNS (Construct and operate up to 14 wind turbines and associated infrastructure including: hardstanding areas to include turbine foundations, crane hardstanding and laydown/storage area with associated micrositing allowances; electrical substation and control building with underground power cables; new access route connecting onto the A472; onsite access tracks, with pipeline and watercourse crossings; borrow pit(s); anemometer mast; temporary construction and storage compound with…
- Received
- 29 May 2025
- Decided
- 14 Nov 2025
- Outcome
- Approved