Blacksmiths Cottage, Pye Corner, Box, SN13 8ED Data via plota.co.uk

PL/2026/02359 - Full planning permission Refused

Proposal

Conversion of Building (former blacksmiths) into dwelling (resubmission of PL/2025/05989) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 Apr 2026
✗
Refused
25 Jun 2026
Appeal
Not lodged

Refused on 25 Jun 2026 · Last checked 21 Aug 2026

Documents 29

All documents on the council site ↗

Associated applications 3

Site constraints 12

10 listed buildings within 150 m of the postcode pin
Nearest: Lamb Cottage Pye Corner, Grade II, about 7 m from the postcode pin · 10 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 10 with distances
Historic England ↗
Green belt: Bath and Bristol
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Cotswolds National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
BOX conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Public byway open to all traffic about 11 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Habitat network: Other Priority Habitats - NEZ
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 6
An estimated 30% or more of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Scheduled monument about 129 m away: Round House
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
National infrastructure project about 1821 m away: Lime Down Solar Project; Inside the Box (Wiltshire) built-up area; Priority habitat about 13 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wiltshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wiltshire
Application type
Full planning permission
Postcode
SN13 8ED
Received
13 Apr 2026
Validated
13 Apr 2026
Ward
Box & Colerne ED
Parish
Box CP
Case officer
Show
Target decision
25 Jun 2026
Decision
Refuse
Decision date
25 Jun 2026

How this decision compares

Decided in 73 days from validation, 7 days slower than Wiltshire's median of 66 for changes of use. Refused, as 15% of changes of use here are.

40%decided within 8 weeks
85%approved
226decided in the last year

Plota live figures for changes of use decided by Wiltshire in the last twelve months, from validation. Wiltshire decision record →

Public comments

6comments received
6 neutral

Last counted 21 Aug 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
18 May 2026
Wiltshire
Planning Authority Score
3.9/10
Below average
#203 of 296 councils
Relevant to this application:
Householder decisions

Wiltshire is slower than most councils at deciding householder applications, ranking #225 out of 296. The council extends the time limit on 55% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Wiltshire decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #71 of 296
96%
Householder approved
Above avg (90%) #65 of 296
53%
Decided in 8 weeks
Below avg (63%) #225 of 296
55%
Extended time limit
Above avg (41%) #252 of 296
78%
Minor dwellings approved
339 decided (1-9 homes)
90%
Major dwellings approved
48 decided (10+ homes)
92%
Change of use approved
160 decided
3,659
Total decisions
256 refused in the year to March 2026