PP/25/04801 - Planning Permission Approved

Proposal

Removal of existing flat roof coverings down to original asphalt substrate across main flat roof areas, tank room roof, and pram/bin store roofs and replacement with new high-performance single-ply membrane system increasing finished roof level by up to 150mm. Installation of GRP (Glass Reinforced Plastic) edge trim to terminate new coverings and overlap existing perimeter coping stones by approximately 25mm. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
30 Oct 2025
✓
Approved
28 May 2026

Approved on 28 May 2026 · Last checked 22 Oct 2026

Planning committee

Decided by Kensington and Chelsea Planning Applications Committee on 26 May 2026.

Approved unanimously

As officers recommended.

  • Officers advised approval because the roof works would have minimal visual impact and no additional effects on neighbours, flooding or fire safety.
  • No consultation responses were received and nobody spoke at the meeting.
  • The committee voted unanimously to grant permission with conditions.
Read how the committee decided The proposed roof works, site context, officers’ assessment, consultation, committee vote and decision.

Source: Plota analysis of Kensington and Chelsea's committee minutes of 26 May 2026.

Site constraints 10

Article 4 direction
Article 4 - No 100. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Air quality management area: Kensington and Chelsea AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
National infrastructure project about 51 m away: Thames Tideway Tunnel
The site is about 51 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, about 1656 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Conservation area about 16 m away: Sloane/Stanley
The edge of the area; work outside it can still affect its setting.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
4 listed buildings within 150 m of the postcode pin
Nearest: Carlyle Building at the Hortensia Road Centre, Grade II, about 48 m from the postcode pin · 1 Grade II*, 3 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 4 with distances
Historic England ↗
Also on the record
Registered park or garden about 217 m away: Brompton Cemetery; Tree preservation order about 16 m away; Inside the Kensington and Chelsea built-up area; Public transport access: PTAL 3 (moderate), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Kensington and Chelsea - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Planning Permission
Postcode
SW10 0QT
Received
30 Oct 2025
Validated
30 Oct 2025
Ward
Stanley
Case officer
Show
Target decision
25 Dec 2025
Decision
Granted
Decision date
28 May 2026
Applicant
Show

How this decision compares

Decided in 210 days from validation, 127 days slower than Kensington and Chelsea's median of 83 for extensions. Approved, as 95% of extensions here are.

33%decided within 8 weeks
95%approved
1,441decided in the last year

Plota live figures for extensions decided by Kensington and Chelsea in the last twelve months, from validation. Kensington and Chelsea decision record →

Consultation & key dates

Comments by
10 Apr 2026
Kensington and Chelsea
Planning Authority Score
5.1/10
Average
#144 of 296 councils
Relevant to this application:
Householder decisions

Kensington and Chelsea ranks #174 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Kensington and Chelsea decision statistics
Based on MHCLG data, the nine months to December 2025
93%
Overall approval rate
Above avg (87%) #58 of 296
94%
Householder approved
Above avg (90%) #110 of 296
61%
Decided in 8 weeks
Below avg (63%) #174 of 296
40%
Extended time limit
Below avg (41%) #152 of 296
94%
Minor dwellings approved
455 decided (1-9 homes)
87%
Change of use approved
53 decided
1,839
Total decisions
135 refused in the nine months to December 2025