4 Rose Cottages, Kilkenny Lane, Englishcombe, Bath, Bath And North East Somerset, BA2 2SL Data via plota.co.uk

26/00456/FUL - Full Application Approved

Proposal

Creation of a drop kerb at the front. Hardstanding and erection of a 14ft long by 4ft high wooden gate and an 8ft long by 4ft high wooden gate onto Kilkenny Lane. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
5 Feb 2026
✓
Validated
11 Mar 2026
✓
Approved
5 May 2026

Approved on 5 May 2026 · Last checked 2 Oct 2026

Site constraints 10

Green belt: Bath and Bristol
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
Also on the record
National landscape about 182 m away: Cotswolds; World heritage site about 162 m away: City of Bath; 1 listed building within 150 m of the postcode pin; Scheduled monument about 215 m away: Wansdyke: section 1230yds (1120m) eastwards from Burnt House Inn; Inside the Bath built-up area; Priority habitat about 31 m away: Deciduous woodland; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Bath - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Bath
Application type
Full Application
Postcode
BA2 2SL
Received
5 Feb 2026
Validated
11 Mar 2026
Ward
Bathavon South
Parish
Englishcombe
Case officer
Show
Target decision
6 May 2026
Decision
PERMIT
Decision date
5 May 2026
Applicant
Show

How this decision compares

Decided in 55 days from validation, about the council's usual 55 days. Approved, as 97% of extensions here are.

60%decided within 8 weeks
97%approved
725decided in the last year

Plota live figures for extensions decided by Bath in the last twelve months, from validation. Bath decision record →

Bath
Planning Authority Score
4.8/10
Below average
#157 of 296 councils
Relevant to this application:
Householder decisions

Bath is slower than most councils at deciding householder applications, ranking #236 out of 296. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Bath decision statistics
Based on MHCLG data, the year to March 2026
95%
Overall approval rate
Above avg (87%) #17 of 296
97%
Householder approved
Above avg (90%) #26 of 296
50%
Decided in 8 weeks
Below avg (63%) #236 of 296
46%
Extended time limit
Above avg (41%) #199 of 296
87%
Minor dwellings approved
172 decided (1-9 homes)
86%
Major dwellings approved
7 decided (10+ homes)
85%
Change of use approved
26 decided
1,817
Total decisions
96 refused in the year to March 2026