Land Between Skateraw And Branxton Data via plota.co.uk

26/00304/AMM - Approval Matters Specified Condition Approved

Proposal

Approval of matters specified in condition 2 of planning permission - in respect of the Substation Development Area including the Substation Enabling Works (Part of Development Zone 4a) and the Substation (Zone 4b) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
24 Mar 2026
✓
Validated
23 Apr 2026
✓
Consultation
23 Apr 2026
✓
Committee
24 Jun 2026
✓
Approved
24 Jun 2026

Approved on 24 Jun 2026 · Committee Decision · Last checked 5 Jul 2026

Planning committee

Decided by East Lothian Planning Committee on 24 Jun 2026.

Approved unanimously

  • Officers advised approval because the proposals accorded with relevant development plan policies and no material considerations outweighed that assessment.
  • Residents and the community council raised concerns about noise, traffic, completeness, drainage, fencing, decommissioning and community involvement.
  • The committee unanimously approved the application subject to six conditions covering finishes, equipment, fencing, paths, public facilities and access visibility.
Read how the committee decided The proposal, site and history, officers’ assessment, objections, speakers, committee debate, vote and decision.

Source: Plota analysis of East Lothian's committee minutes of 24 Jun 2026.

Associated applications 2

  • Part of

    FullApprovedcouncil archive

    Conditions 2 discharged

    • ConditionsApproval of matters specified in condition 2 - in respect of the Substation Development Area…This application26/00304/AMM

Site constraints 3

Registered battlefield: Battle of Flodden 1513
Nationally designated heritage. Its significance and setting carry great weight.
Registered parks and gardens, battlefields, world heritage sites and protected wrecks are designated heritage assets: harm needs clear and convincing justification.
Historic England ↗
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Lothian - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Approval Matters Specified Condition
Postcode
TD12 4SN
Received
24 Mar 2026
Validated
23 Apr 2026
Ward
Dunbar
Parish
East Lammermuir Community Council
Case officer
Show
Target decision
22 Aug 2026
Decision
Application Permitted
Decision date
24 Jun 2026
Decision level
Committee Decision
Applicant
Show

How this decision compares

Decided in 62 days from validation, 20 days slower than East Lothian's median of 42 for utility and infrastructure works. Approved, as 97% of utility and infrastructure works here are.

86%decided within 8 weeks
97%approved
7%go to committee

Plota live figures for utility and infrastructure works decided by East Lothian in the last twelve months, from validation. East Lothian decision record →

Consultation & key dates

Neighbours
25 Jun 2026
Consultation
23 Apr 2026
Comments by
7 May 2026
Site or press notice
1 May 2026
Committee
24 Jun 2026
Env. assessment
No