Huddleston Hall Huddleston South Milford West Yorkshire LS25 6JX Data via plota.co.uk

SELZG2026/0184/FUL - Full permission Approved

Proposal

Demolition of the Grade II Listed stables (4 Box) Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
2 Mar 2026
✓
Validated
30 Mar 2026
✓
Consultation
1 Apr 2026
✓
Approved
24 Aug 2026

Approved on 24 Aug 2026 · Chief Planner · Last checked 26 Sept 2026

Site constraints 7

Grade II* listed: Huddleston Hall
List entry 1167923 · 2 m away · 7 more listed buildings within 150 m (2 Grade II*, 5 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 7 with distances
Historic England ↗
Green belt: South and West Yorkshire
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm. Some green belt land can count as grey belt, where it does not strongly serve the green belt's purposes. The council decides this in its green belt assessment or on each application, so we do not mark it here.
Read the government guidance ↗
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 2. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
National infrastructure project 177 m away: Yorkshire GREEN
The site is 177 m from the project boundary. Electricity line, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Heritage at risk 1 m away: Huddleston Hall, Laith Staid Lane; Radon affected area, class 2; Coalfield, development low risk area.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Mining Remediation Authority, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Selby - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Selby
Application type
Full permission
Postcode
LS25 6JX
Received
2 Mar 2026
Validated
30 Mar 2026
Ward
Sherburn in Elmet
Parish
Huddleston with Newthorpe
Case officer
Show
Target decision
19 Aug 2026
Decision
Application Permitted
Decision date
24 Aug 2026
Decision level
Chief Planner
Applicant
Show
Agent
Purcell

How this decision compares

Decided in 147 days from validation, 91 days slower than Selby's median of 56 for demolitions. Approved, as 81% of demolitions here are.

56%decided within 8 weeks
81%approved
45decided in the last year

Plota live figures for demolitions decided by Selby in the last twelve months, from validation. Selby decision record →

Public comments

No public comments yet.

Last counted 26 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14719519
Planning Portal ref
PP-14719519
Consultation
1 Apr 2026
Comments by
10 Aug 2026
Site or press notice
14 Apr 2026
Statutory expiry
25 May 2026
Env. assessment
No