Phase 4 Unit 2, New Mill Road, Orpington, BR5 3QA Data via plota.co.uk
Proposal
Change of use from Class B8 to flexible Class E(g)(i), (ii), (iii), B2, and/or B8 use with alterations to unit including rooftop PV panels; replacement plant, refuse store and alterations to car park. Data via plota.co.uk
Application progress
Approved on 8 Apr 2026 · Delegated Decision · Last checked 22 Aug 2026
Documents 15
Decision & officer reports 2
Statements & assessments 3
Plans & drawings 8
Application forms 1
Other documents 1
Associated applications 2
- Change of use from Class B8 to flexible Class E(g)(i), (ii), (iii), B2, and/or B8 use with alterations to unit including rooftop…
Conditions 5 awaiting decision
Site constraints 10
Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI), Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.
Every application in Bromley - and every UK council - as a live feed, an API, or a bulk CSV export.
Nearby new applications
CRAYFIELD HOUSE, CRAYFIELD INDUSTRIAL PARK, MAIN ROAD, ST PAULS CRAY, ORPINGTON, BR5 3HP
Application under S73 of the Town and Country Planning Act to planning permissio...
2 MIDFIELD WAY, ORPINGTON, BR5 2QJ
Erection of single-storey side and rear extensions and a front entrance veranda;...
PHASE 4 UNIT 2, NEW MILL ROAD, ORPINGTON, BR5 3QA
Details submitted to comply with the requirements of the following conditions re...
Nash House, Crayfield Industrial Park, Main Road, Orpington, BR5 3HP
Alterations to existing roof including front dormer window and raising of ridge ...
3 MIDFIELD WAY, ORPINGTON, BR5 2QH
Single storey rear extension, extending beyond the rear wall of the original hou...
117 SEVENOAKS WAY, ORPINGTON, BR5 3AQ
Details submitted to comply with the requirements of the following conditions re...
Important details
How this decision compares
Decided in 56 days from validation, about the council's usual 56 days. Approved, as 60% of changes of use here are.
Plota live figures for changes of use decided by Bromley in the last twelve months, from validation. Bromley decision record →
Public comments
No public comments yet.
Last counted 22 Aug 2026
Consultation & key dates
- Comments by
- 6 Mar 2026
Historical activity at this location
10 nearby applications on record - archival context, not part of the live application.
Nearby activity
Bromley ranks #143 out of 296 councils for householder decision speed. Bromley is also one of the strictest councils - it refuses more householder applications than almost any other, with only 79% approved vs 90% nationally.
Track this application
Phase 4 Unit 2, New Mill Road, Orpington, BR5 3QA
Tracking this application
Not there in a minute? Check junk - especially Hotmail and Outlook.
Go to your dashboard →Sign in to view contact details
Applicant and case-officer names are hidden from public view for privacy. Create a free Plota account - or sign back in - and we'll show them, plus you get a dashboard for alerts and tracked applications.
