Outside 47 Station Road Claydon Ipswich Suffolk IP6 0HS Data via plota.co.uk

DC/26/04438 - Development by statutory undertaker Awaiting decision

Proposal

Development by a Statutory Undertaker - Approximately 33 metre(s) of underground duct and cables Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
12 Oct 2026
Decision
Expected by 9 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 6 Dec 2026, from Babergh Mid Suffolk's recent utility and infrastructure works.

Site constraints 6

In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From rivers. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
National infrastructure project 990 m away: East Anglia THREE Offshore Wind Farm
The site is 990 m from the project boundary. Generating station, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Inside the Claydon built-up area; Priority habitat 38 m away: No main habitat but additional habitats present; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 4, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 13 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Babergh Mid Suffolk - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Development by statutory undertaker
Postcode
IP6 0HS
Received
12 Oct 2026
Validated
12 Oct 2026
Ward
Claydon & Barham
Parish
Claydon
Case officer
Show
Target decision
9 Nov 2026
Applicant
Show

Decision outlook

Day 16 of the 56-day target. Babergh Mid Suffolk usually decides utility and infrastructure works by day 55.

Day 1640 days to the 56-day target
73%decided within 8 weeks
96%approved
63decided in the last year

Plota live figures for utility and infrastructure works decided by Babergh Mid Suffolk in the last twelve months, from validation. Babergh Mid Suffolk decision record →

Public comments

No public comments yet.

Last counted 27 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Statutory expiry
9 Nov 2026
Env. assessment
No
Babergh Mid Suffolk
Planning Authority Score
7.7/10
Good
#33 of 296 councils
Relevant to this application:
Householder decisions

Babergh Mid Suffolk is faster than most councils at deciding householder applications, ranking #56 out of 296. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Faster than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Babergh Mid Suffolk decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #124 of 296
95%
Householder approved
Above avg (90%) #68 of 296
77%
Decided in 8 weeks
Above avg (63%) #56 of 296
34%
Extended time limit
Below avg (41%) #83 of 296
74%
Minor dwellings approved
160 decided (1-9 homes)
73%
Major dwellings approved
11 decided (10+ homes)
93%
Change of use approved
40 decided
882
Total decisions
99 refused in the year to March 2026