Children 1st Martin Forster House 10 Appleton Gate Newark On Trent NG24 1JY Data via plota.co.uk

Decided 26/01722/TWCA
Date received
22 Oct 2026
Date validated
22 Oct 2026
Postcode
NG24 1JY

Description

T1 - Acacia - fell under 5 day notice due to condition Data via plota.co.uk

Last checked

Site constraints 6

40 listed buildings within 150 m of the postcode pin
Nearest: The Palace Theatre, Grade II, about 2 m from the postcode pin · 1 Grade I, 3 Grade II*, 36 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 40 with distances
Historic England ↗
Newark conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Heritage at risk: Newark
On the register of historic places assessed as at risk.
A designated building, monument, park or conservation area assessed as at risk from neglect, decay or development. Proposals that secure its future are looked on favourably.
Historic England ↗
National infrastructure project about 665 m away: A46 Newark Bypass
The site is about 665 m from the project boundary. Highway, decided. The project page says whether consent was granted. Also within 2 km: H2East Pipeline: Humber to Nottinghamshire (at pre-application, about 846 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Scheduled monument about 156 m away: Civil War town defences within the Friary Garden
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
Inside the Newark-on-Trent built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 24 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Newark and Sherwood - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Newark and Sherwood
Planning Authority Score
3.9/10
Below average
#198 of 296 councils
Relevant to this application:
Householder decisions

Newark and Sherwood is slower than most councils at deciding householder applications, ranking #241 out of 296. 54% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Newark and Sherwood decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #88 of 296
96%
Householder approved
Above avg (90%) #55 of 296
50%
Decided in 8 weeks
Below avg (63%) #241 of 296
54%
Extended time limit
Above avg (41%) #244 of 296
80%
Minor dwellings approved
110 decided (1-9 homes)
88%
Major dwellings approved
25 decided (10+ homes)
82%
Change of use approved
33 decided
767
Total decisions
63 refused in the year to March 2026