6 Spring Close Kilsby CV23 8YZ Data via plota.co.uk

2026/3325/HH - Householder Planning Permission 5 - Site Visit Complete (1-10)

Proposal

Installation of an air-conditioning unit on an outbuilding Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
3 Aug 2026
✓
Validated
20 Aug 2026
Decision
Expected by 13 Nov 2026

Under consideration

No decision has been issued yet. Plota predicts a decision by 13 Nov 2026, from West Northamptonshire's recent utility and infrastructure works.

The consultation period closed on 21 Sept 2026.

Site constraints 4

National infrastructure project about 78 m away: Daventry International Rail Freight Terminal
The site is about 78 m from the project boundary. Rail freight interchange, decided. The project page says whether consent was granted.
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Radon affected area, class 2; Inside the Kilsby built-up area; Natural England's Provisional ALC map (1:250,000, 1970s) had this area as grade 3, but it predates the buildings here and the current map does not class it as farmland.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Sales history 3

Last sold for £250,000 in September 2006. Detached house, freehold.

15 September 2006£250,000
10 August 1999£128,000
25 March 1997£107,000

Sale prices from HM Land Registry's price paid record, matched to this application by its address.

Work with planning data?

Every application in West Northamptonshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Householder Planning Permission
Postcode
CV23 8YZ
Received
3 Aug 2026
Validated
20 Aug 2026
Ward
Braunston & Crick Ward
Parish
Kilsby
Target decision
13 Nov 2026
Decision level
Delegated
Applicant
Show
Agent
Pitch Architects Limited

Decision outlook

Day 70 of the 56-day target. West Northamptonshire usually decides utility and infrastructure works by day 71.

Day 701 days to the predicted decision (day 71)
27%decided within 8 weeks
91%approved
48decided in the last year

Plota live figures for utility and infrastructure works decided by West Northamptonshire in the last twelve months, from validation. West Northamptonshire decision record →

Consultation & key dates

Comments by
21 Sept 2026
West Northamptonshire
Planning Authority Score
1.7/10
Poor
#280 of 296 councils
Relevant to this application:
Householder decisions

West Northamptonshire is one of the slowest councils in England for householder decisions, ranking #295 out of 296. The council extends the time limit on 79% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
West Northamptonshire decision statistics
Based on MHCLG data, the year to March 2026
90%
Overall approval rate
Above avg (87%) #123 of 296
93%
Householder approved
Above avg (90%) #144 of 296
18%
Decided in 8 weeks
Below avg (63%) #295 of 296
79%
Extended time limit
Above avg (41%) #295 of 296
81%
Minor dwellings approved
170 decided (1-9 homes)
83%
Major dwellings approved
24 decided (10+ homes)
86%
Change of use approved
207 decided
1,832
Total decisions
179 refused in the year to March 2026

Sale prices: Contains HM Land Registry data © Crown copyright and database right 2026. This data is licensed under the Open Government Licence v3.0.