Century House 31 - 32 Soho Square London W1D 3AP Data via plota.co.uk

26/03161/FULL - Full Planning Permission Application Pending

Proposal

Part demolition of 31- 32 Soho Square, demolition of 65-66 Frith Street, and retention and refurbishment of 22-25 Dean Street (across basement to second floor only) and 10 Chapone Place, to provide office and retail uses (Use Class E), alongside new public realm to Chapone Place and other associated works. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
13 May 2026
✓
Validated
9 Jun 2026
✓
Consultation
10 Jun 2026
Decision
Target date was 4 Aug 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 19 Oct 2026; it is now day 132.

The consultation period closed on 8 Jul 2026.

Documents 158

Statements & assessments 52

PDF AIR QUALITY ASSESSMENT Air quality assessment · 13 May 2026 View ↗ PDF ARCHAEOLOGICAL DESK BASED ASSESSMENT Background Papers · 13 May 2026 View ↗ PDF BREEAM PRE-ASSESSMENT Other · 13 May 2026 View ↗ PDF CIRCULAR ECONOMY STATEMENT Other · 13 May 2026 View ↗ PDF CIRCULAR ECONOMY STATEMENT Other · 13 May 2026 View ↗ PDF CIRCULAR ECONOMY STATEMENT Other · 13 May 2026 View ↗ PDF CIRCULAR ECONOMY STATEMENT Other · 13 May 2026 View ↗ PDF CIRCULAR ECONOMY STATEMENT Other · 13 May 2026 View ↗ PDF CIRCULAR ECONOMY STATEMENT Other · 13 May 2026 View ↗ PDF CIRCULAR ECONOMY STATEMENT Other · 13 May 2026 View ↗ PDF CIRCULAR ECONOMY STATEMENT Other · 13 May 2026 View ↗ PDF CIRCULAR ECONOMY STATEMENT Other · 13 May 2026 View ↗ PDF CIRCULAR ECONOMY STATEMENT Other · 13 May 2026 View ↗ PDF CONTAMINATED LAND ASSESSMENT Background Papers · 13 May 2026 View ↗ PDF DAYLIGHT AND SUNLIGHT REPORT Daylight and Sunlight assessment · 13 May 2026 View ↗ PDF DAS PART 1 Design and Access Statement · 13 May 2026 View ↗ PDF DAS PART 2 Design and Access Statement · 13 May 2026 View ↗ PDF DAS PART 9 AND 10 Design and Access Statement · 13 May 2026 View ↗ PDF DAS PART 11 Design and Access Statement · 13 May 2026 View ↗ PDF DAS PART 12 Design and Access Statement · 13 May 2026 View ↗ PDF DAS PART 13-15 Design and Access Statement · 13 May 2026 View ↗ PDF DAS PARTS 3-6 Design and Access Statement · 13 May 2026 View ↗ PDF DAS PARTS 7 AND 8 Design and Access Statement · 13 May 2026 View ↗ PDF ENERGY STATEMENT Energy Assessment · 13 May 2026 View ↗ PDF SOHO SQUARE AND FRITH STREET FIRE STATEMENT Background Papers · 13 May 2026 View ↗ PDF CHAPONE PLACE FIRE STATEMENT Background Papers · 13 May 2026 View ↗ PDF DEAN STREET FIRE STATEMENT Background Papers · 13 May 2026 View ↗ PDF FLOOD RISK ASSESSMENT PART 1 Flood risk assessment · 13 May 2026 View ↗ PDF HERITAGE STATEMENT Heritage Statement · 13 May 2026 View ↗ PDF HERITAGE STATEMENT Heritage Statement · 13 May 2026 View ↗ PDF HERITAGE STATEMENT Heritage Statement · 13 May 2026 View ↗ PDF HERITAGE STATEMENT Heritage Statement · 13 May 2026 View ↗ PDF LANDSCAPE STATEMENT Design and Access Statement · 13 May 2026 View ↗ PDF LIGHTING ASSESSMENT Background Papers · 13 May 2026 View ↗ PDF NOISE IMPACT ASSESSMENT Noise impact assessment · 13 May 2026 View ↗ PDF PLANNING STATEMENT Planning Statement · 13 May 2026 View ↗ PDF PRELIMINARY ECOLOGICAL APPRAISAL Other · 13 May 2026 View ↗ PDF STATEMENT OF COMMUNITY INVOLVEMENT Background Papers · 13 May 2026 View ↗ PDF STRUCTURAL METHOD STATEMENT Background Papers · 13 May 2026 View ↗ PDF BUILDING DAMAGE ASSESSMENT Background Papers · 13 May 2026 View ↗ PDF SUSTAINABLE DESIGN STATEMENT Other · 13 May 2026 View ↗ PDF SUSTAINABLE DESIGN STATEMENT Other · 13 May 2026 View ↗ PDF SUSTAINABLE DESIGN STATEMENT PART 3 Other · 13 May 2026 View ↗ PDF TRANSPORT STATEMENT Transport Statement · 13 May 2026 View ↗ PDF UTILITIES ASSESSMENT PART 1 Background Papers · 13 May 2026 View ↗ PDF UTILITIES ASSESSMENT PART 2 Background Papers · 13 May 2026 View ↗ PDF UTILITIES ASSESSMENT PART 3 Background Papers · 13 May 2026 View ↗ PDF UTILITIES ASSESSMENT PART 4 Background Papers · 13 May 2026 View ↗ PDF VENTILATION AND EXTRACTION STATEMENT Background Papers · 13 May 2026 View ↗ PDF WHOLE LIFE CARBON ASSESSMENT Other · 13 May 2026 View ↗ PDF WHOLE LIFE CARBON ASSESSMENT Other · 13 May 2026 View ↗ PDF WHOLE LIFE CARBON ASSESSMENT PART 3 Other · 13 May 2026 View ↗

Plans & drawings 86

PDF CONSTRUCTION MANAGEMENT PLAN Other · 13 May 2026 View ↗ PDF DRAWING ISSUE SHEET Background Papers · 13 May 2026 View ↗ PDF BASEMENT PLAN Drawing · 13 May 2026 View ↗ PDF GROUND FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF GROUND FLOOR MEZZANINE PLAN Drawing · 13 May 2026 View ↗ PDF FIRST FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF SECOND FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF THIRD FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF FOURTH FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF FIFTH FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF SIXTH FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF SEVENTH FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF ROOF PLAN Drawing · 13 May 2026 View ↗ PDF SECTION AA Drawing · 13 May 2026 View ↗ PDF SECTION BB Drawing · 13 May 2026 View ↗ PDF SECTION CC Drawing · 13 May 2026 View ↗ PDF EAST ELEVATION FRITH STREET Drawing · 13 May 2026 View ↗ PDF NORTH ELEVATION SOHO SQUARE Drawing · 13 May 2026 View ↗ PDF WEST ELEVATION CHAPONE PLACE Drawing · 13 May 2026 View ↗ PDF SOUTH ELEVATION CHAPONE PLACE Drawing · 13 May 2026 View ↗ PDF NORTH ELEVATION CHAPONE PLACE Drawing · 13 May 2026 View ↗ PDF EAST ELEVATION CHAPONE PLACE Drawing · 13 May 2026 View ↗ PDF WEST ELEVATION DEAN STREET Drawing · 13 May 2026 View ↗ PDF SOUTH ELEVATION ROYALTY MEWS Drawing · 13 May 2026 View ↗ PDF SITE LOCATION PLAN Location Plan · 13 May 2026 View ↗ PDF SITE PLAN Background Papers · 13 May 2026 View ↗ PDF BASEMENT FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF GROUND FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF GROUND FLOOR MEZZANINE FLOOR Drawing · 13 May 2026 View ↗ PDF GA PLANS FIRST FLOOR PLANS Drawing · 13 May 2026 View ↗ PDF SECOND FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF GA PLANS THIRD FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF GA PLANS FOURTH FLOOR PLANS Drawing · 13 May 2026 View ↗ PDF GA PLANS FIFTH FLOOR PLANS Drawing · 13 May 2026 View ↗ PDF GA SIXTH FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF GA PLANS SEVENTH FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF GA PLANS EIGHT FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF GA PLAN ROOF LEVEL PLAN Drawing · 13 May 2026 View ↗ PDF GA SECTIONS AA Drawing · 13 May 2026 View ↗ PDF GA SECTIONS BB Drawing · 13 May 2026 View ↗ PDF GA SECTIONS CC Drawing · 13 May 2026 View ↗ PDF GA ELEVATIONS FRITH STREET EAST ELEVATIONS Drawing · 13 May 2026 View ↗ PDF GA ELEVATIONS SOHO SQUARE NORTH ELEVATION Drawing · 13 May 2026 View ↗ PDF GA ELEVATIONS CHAPONE PLACE WEST ELEVATION Drawing · 13 May 2026 View ↗ PDF GA ELEVATIONS CHAPONE PLACE SOUTH ELEVATION Drawing · 13 May 2026 View ↗ PDF GA ELEVATIONS CHAPONE PLACE NORTH ELEVATION Drawing · 13 May 2026 View ↗ PDF GA ELEVATIONS CHAPONE PLACE EAST ELEVATION Drawing · 13 May 2026 View ↗ PDF GA ELEVATIONS DEAN STREET WEST ELEVATION Drawing · 13 May 2026 View ↗ PDF GA ELEVATIONS ROYALTY MEWS SOUTH ELEVATION Drawing · 13 May 2026 View ↗ PDF DEMOLITION DRAWINGS SOUTH ELEVATION ROYALTY MEWS Drawing · 13 May 2026 View ↗ PDF DEMOLITION DRAWINGS BASEMENT PLAN Drawing · 13 May 2026 View ↗ PDF DEMOLITION DRAWINGS GROUND FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF DEMOLITION DRAWINGS GROUND FLOOR MEZZANINE PLAN Drawing · 13 May 2026 View ↗ PDF DEMOLITION DRAWINGS FIRST FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF DEMOLITION DRAWINGS SECOND FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF DEMOLITION DRAWINGS THIRD FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF DEMOLITION DRAWINGS FOURTH FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF DEMOLITION DRAWINGS FIFTH FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF DEMOLITION DRAWINGS SIXTH FLOOR PLAN Background Papers · 13 May 2026 View ↗ PDF DEMOLITION DRAWINGS SEVENTH FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF DEMOLITION DRAWINGS ROOF PLAN Drawing · 13 May 2026 View ↗ PDF DEMOLITION DRAWINGS SECTION AA Drawing · 13 May 2026 View ↗ PDF DEMOLITION DRAWINGS EAST ELEVATION FRITH STREET Drawing · 13 May 2026 View ↗ PDF DEMOLITION DRAWINGS NORTH ELEVATION SOHO SQUARE Drawing · 13 May 2026 View ↗ PDF DEMOLITION DRAWINGS WEST ELEVATION CHAPONE PLACE Drawing · 13 May 2026 View ↗ PDF DEMOLITION DRAWING SOUTH ELEVATION CHAPONE PLACE Drawing · 13 May 2026 View ↗ PDF DEMOLITION DRAWINGS NORTH ELEVATION CHAPONE PLACE Drawing · 13 May 2026 View ↗ PDF DEMOLITION DRAWINGS EAST ELEVATION CHAPONE PLACE Drawing · 13 May 2026 View ↗ PDF DEMOLITION DRAWINGS WEST ELEVATION DEAN STREET Drawing · 13 May 2026 View ↗ PDF DRAWING PLAN SET - 2 Drawing · 13 May 2026 View ↗ PDF FLOOR PLAN SET - 1 Drawing · 13 May 2026 View ↗ PDF FLOOR PLAN SET - 2 Drawing · 13 May 2026 View ↗ PDF FLOOR PLAN SET - 3 Drawing · 13 May 2026 View ↗ PDF DRAWING PLAN SET - 1 Drawing · 13 May 2026 View ↗ PDF OUTLINE CONSTRUCTION LOGISTICS PLAN Other · 13 May 2026 View ↗ PDF SITE ENVIRONMENTAL MANAGEMENT PLAN Other · 13 May 2026 View ↗ PDF FOURTH - FIFTH & SIXTH FLOOR PLANS Drawing · 13 May 2026 View ↗ PDF FLOOR PLAN SET - 4 Drawing · 13 May 2026 View ↗ PDF FLOOR PLAN SET - 5 Drawing · 13 May 2026 View ↗ PDF SIXTH & SEVENTH FLOOR PLANS Drawing · 13 May 2026 View ↗ PDF EXISTING AND PROPOSED DRAWINGS - 5 Drawing · 13 May 2026 View ↗ PDF EXISTING AND PROPOSED DRAWINGS - 3 Drawing · 13 May 2026 View ↗ PDF EXISTING AND PROPOSED DRAWINGS - 4 Drawing · 13 May 2026 View ↗ PDF SIXTH & SEVENTH FLOOR PLAN Drawing · 13 May 2026 View ↗ PDF EXISTING AND PROPOSED DRAWINGS - 1 Drawing · 13 May 2026 View ↗ PDF EXISTING AND PROPOSED DRAWINGS - 2 Drawing · 13 May 2026 View ↗

All documents on the council site ↗

Site constraints 11

Soho conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
2 Article 4 directions
Article 4 Basement Development Permitted Rights Removed · Article 4 Direction Class E To C3 In Central Activities Zone. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Protected view corridor: 2B.1 Parliament Hill oak tree to the Palace of Westminster
Inside the landmark viewing corridor of a protected vista. A building that rises above the corridor's threshold height should be refused. How high that is depends on where along the view the site is.
The London Plan (policy HC4) designates strategic views, and the Mayor's London View Management Framework (March 2012) gives 13 of them a protected vista toward St Paul's Cathedral, the Palace of Westminster or the Tower of London. A vista has a threshold height that rises or falls with the line of sight. In the landmark viewing corridor, a building above it would harm the view and should be refused. In the wider setting consultation area around the corridor, a building above it is referred for consultation and its effect on the view is judged. The threshold changes along each view and is set out in the framework. A revised framework is out for consultation until 4 December 2026 and is not yet in force.
London View Management Framework ↗
Archaeological priority area: City of Westminster APA 2.5
An assessment or field evaluation may be asked for before ground works.
The council or Historic England considers archaeology likely here. A desk-based assessment, and sometimes trial trenching, can be asked for with the application.
Air quality management area: Westminster AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Town centre: West End
A designated centre in the London Plan.
Shops, services and active frontages are protected in centres, and main town centre uses are steered here first.
69 listed buildings within 150 m
Nearest: 36, Soho Square W1, Grade II, 24 m away · 2 Grade I, 13 Grade II*, 53 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 69 with distances
Historic England ↗
Central activities zone
The core of central London in the London Plan.
Offices, culture and the other strategic functions of the centre take priority over new housing here.
National infrastructure project 845 m away: Thames Tideway Tunnel
The site is 845 m from the project boundary. Waste water treatment, decided. The project page says whether consent was granted. Also within 2 km: London Strategic Heat Main Project (at pre-application, 131 m).
Nationally significant infrastructure projects (power stations, electricity lines, pipelines, major roads and railways, harbours, airports and reservoirs) are consented by a Secretary of State under the Planning Act 2008, after an examination by the Planning Inspectorate, rather than by the council. The boundary is the one the Inspectorate consults on and can change as the scheme does. Projects are shown within 2 km of the site.
Planning Inspectorate project page ↗
Also on the record
Inside the City of Westminster built-up area; Public transport access: PTAL 6b (excellent), TfL 2023, for the 100 m square.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 6 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate, Transport for London (public transport access levels, Powered by TfL Open Data, OGL v3.0, contains OS data © Crown copyright and database right 2025) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Westminster - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Full Planning Permission Application
Postcode
W1D 3AP
Received
13 May 2026
Validated
9 Jun 2026
Ward
West End
Case officer
Show
Target decision
4 Aug 2026
Agent
DP9 Ltd
Freehold owner
Show

Decision outlook

Day 132, past the statutory target. 83% of commercial and major works in Westminster are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 18 Oct 2026.

Day 13276 days past the 56-day target
52%decided within 8 weeks
92%approved
235decided in the last year

Plota live figures for commercial and major works decided by Westminster in the last twelve months, from validation. Westminster decision record →

Public comments

7comments received
2 objecting2 neutral3 supporting

43% support · above the UK average of 16%

232 neighbours consulted · Last counted 18 Oct 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-14291806
Planning Portal ref
PP-14291806
Comments by
8 Jul 2026
Site or press notice
10 Jun 2026
Committee
27 Oct 2026
Env. assessment
No
Westminster
Planning Authority Score
3.5/10
Below average
#221 of 296 councils
Relevant to this application:
Householder decisions

Westminster is slower than most councils at deciding householder applications, ranking #258 out of 296. Only 28% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 81% approved vs 90% nationally.

One of the strictest councils
only 81% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Westminster decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #201 of 296
81%
Householder approved
Below avg (90%) #277 of 296
44%
Decided in 8 weeks
Below avg (63%) #258 of 296
28%
Extended time limit
Below avg (41%) #46 of 296
83%
Minor dwellings approved
12 decided (1-9 homes)
67%
Major dwellings approved
3 decided (10+ homes)
81%
Change of use approved
133 decided
4,602
Total decisions
648 refused in the year to March 2026

Freehold owner: Information produced by HM Land Registry. © Crown copyright 2026. Source: HM Land Registry, UK and overseas companies that own property in England and Wales, September 2026 release.