Street Record Langney Road Eastbourne East Sussex Data via plota.co.uk

250800 - Prior Notification (telecoms) Pending

Proposal

Regulation 5 notification for the replacement of 6no. antennas with 9no. antennas and the addition of 300mm, internal upgrades to existingequipment cabinet, associated ancillary works Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
19 Dec 2025
Decision
Target date was 21 Jan 2026

Under consideration

No decision has been issued yet. Plota predicted a decision around 29 Oct 2026; it is now day 314.

Site constraints 5

Town Centre and Seafront conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
In flood zones plus climate change
Inside the extent flood zones 2 and 3 could reach with climate change: the Central allowance for the 2080s on rivers, the Upper End allowance for sea level rise to 2125. From the sea. Defences are not counted.
The Environment Agency flood map for planning. Councils use it to decide when a flood risk assessment and the sequential test are needed. It is indicative and does not show whether a particular property will flood.
Flood map ↗
Radon affected area, class 5
An estimated 10 to 30% of homes reach the radon action level. Indicative for the 1 km square, which takes the highest class found in it; a radon test gives the answer for a building.
From the British Geological Survey and UK Health Security Agency indicative atlas. Under building regulations, as the BRE guide BR 211 (2023) sets out, new buildings and extensions need basic radon protection from class 3 in England and Wales and from class 2 in Scotland, and full protection from class 5. The class at the site itself, from the detailed BGS map, decides which.
UKHSA radon ↗
6 listed buildings within 150 m
Nearest: Leaf Hall, Grade II, 32 m away · 6 Grade II
The site itself is not listed. Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show all 6 with distances
Historic England ↗
Also on the record
Inside the Eastbourne built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 14 October 2026. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Eastbourne - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Eastbourne
Application type
Prior Notification (telecoms)
Received
19 Dec 2025
Validated
19 Dec 2025
Ward
Devonshire
Case officer
Show
Target decision
21 Jan 2026
Decision level
Delegated List
Applicant
Show

Decision outlook

Day 314, past the statutory target. 91% of prior approvals in Eastbourne are decided within thirteen weeks; extensions of time are common, and the council need not decide on the day. Last seen undecided on 28 Oct 2026.

Day 314258 days past the 56-day target
82%decided within 8 weeks
88%approved
21decided in the last year

Plota live figures for prior approvals decided by Eastbourne in the last twelve months, from validation. Eastbourne decision record →

Eastbourne
Planning Authority Score
6.4/10
Average
#82 of 296 councils
Relevant to this application:
Householder decisions

Eastbourne ranks #160 out of 296 councils for householder decision speed. Only 30% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Rarely extends deadlines
decisions usually arrive on time
These figures are council-wide context, not a prediction for this application. View full council performance
Eastbourne decision statistics
Based on MHCLG data, the year to March 2026
86%
Overall approval rate
Below avg (87%) #194 of 296
94%
Householder approved
Above avg (90%) #106 of 296
62%
Decided in 8 weeks
Below avg (63%) #160 of 296
30%
Extended time limit
Below avg (41%) #53 of 296
63%
Minor dwellings approved
32 decided (1-9 homes)
83%
Major dwellings approved
6 decided (10+ homes)
79%
Change of use approved
24 decided
325
Total decisions
46 refused in the year to March 2026