66 - 90 Bridge Road Litherland L21 6PH Data via plota.co.uk

DC/2026/01559 - Full Application Registered

Proposal

Erection of two storey extension, first floor extension, formation of replacement access ramp and steps and alterations to pedistrain access. Installation of P.V panels, provision of cycle store and internal alterations. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
around 19 Oct 2026
Decision
Expected by 14 Dec 2026

Under consideration

No decision has been issued yet. Plota predicts a decision around 9 Dec 2026, from Sefton's recent extensions.

Site constraints 4

Article 4 direction
Bootle and Waterloo HMO. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Local nature reserve 288 m away: Brook Vale
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Also on the record
National infrastructure project 940 m away: Mersey Tidal Power Project, at pre-application; Inside the Litherland built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 28 October 2026. Historic England, the Environment Agency, Natural England, the Planning Inspectorate and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Sefton - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Sefton
Application type
Full Application
Postcode
L21 6PH
Received
around 19 Oct 2026
Validated
19 Oct 2026
Ward
Litherland Ward
Target decision
14 Dec 2026
Applicant
Show
Agent
Philip Seddon Associates Ltd

Decision outlook

Day 10 of the 56-day target. Sefton usually decides extensions by day 51.

Day 1046 days to the 56-day target
76%decided within 8 weeks
97%approved
504decided in the last year

Plota live figures for extensions decided by Sefton in the last twelve months, from validation. Sefton decision record →

Consultation & key dates

Statutory expiry
14 Dec 2026
Env. assessment
No
Sefton
Planning Authority Score
6.4/10
Average
#84 of 296 councils
Relevant to this application:
Householder decisions

Sefton ranks #119 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Sefton decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #66 of 296
96%
Householder approved
Above avg (90%) #59 of 296
71%
Decided in 8 weeks
Above avg (63%) #119 of 296
39%
Extended time limit
Below avg (41%) #141 of 296
87%
Minor dwellings approved
82 decided (1-9 homes)
87%
Major dwellings approved
15 decided (10+ homes)
78%
Change of use approved
76 decided
1,029
Total decisions
75 refused in the year to March 2026