Land South Of River Great Ouse And North Of Evenley Road Mixbury. Data via plota.co.uk

25/02917/SCH17 - HS2 Schedule 17 submissions Approved

Proposal

In accordance with requirements of Paragraph 9(4)(b) of Schedule 17 to the High-Speed Rail (London - West Midlands) Act 2017, the nominated undertaker hereby requests approval of a SCHEME OF MITIGATION for Scheduled Work Nos. 2/49, 2/105B, 2/106, 2/106A, 2/107 and 2/107A as described in Schedule 1 of the HS2 (London - West Midlands) Act 2017. Data via plota.co.uk

View original council record ↗Last checked

Application progress

✓
Received
7 Nov 2025
✓
Approved
8 May 2026

Approved on 8 May 2026 · Delegated · Last checked 8 Oct 2026

Documents 23

All documents on the council site ↗

Site constraints 4

Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Source: the Predictive Agricultural Land Classification Map (Defra and Natural England, 2025; the Welsh Government's Predictive ALC Map 2 in Wales), a model rather than a site survey. Natural England's Provisional ALC map (1:250,000, 1970s), which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Scheduled monument about 47 m away: Beaumont Castle
Its setting is a consideration for work nearby.
Nationally important archaeology protected by the Secretary of State. Work that affects the monument or its setting is rarely permitted.
Historic England ↗
Also on the record
Radon affected area, class 2; Conservation area about 47 m away: Mixbury.
Not affected
Outside flood zones 2 and 3 · Not green belt

Checked on 17 October 2026. The pin for this application is the centre of its postcode rather than the building, so distances to nearby designations are measured from the postcode and can be out by the width of the postcode area. Historic England, the Environment Agency, Natural England, the British Geological Survey and UK Health Security Agency (radon, contains BGS materials © UKRI) and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Cherwell - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Cherwell
Application type
HS2 Schedule 17 submissions
Received
7 Nov 2025
Validated
7 Nov 2025
Case officer
Show
Target decision
8 May 2026
Decision
Permitted
Decision date
8 May 2026
Decision level
Delegated
Applicant
Show
Agent
Eiffage Kier JV Ferrovial BAM

How this decision compares

Decided in 182 days from validation, 122 days slower than Cherwell's median of 60 for full applications. Approved, as 91% of full applications here are.

44%decided within 8 weeks
91%approved
681decided in the last year

Plota live figures for full applications decided by Cherwell in the last twelve months, from validation. Cherwell decision record →

Cherwell
Planning Authority Score
3.6/10
Below average
#214 of 296 councils
Relevant to this application:
Householder decisions

Cherwell is slower than most councils at deciding householder applications, ranking #247 out of 296. 49% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Cherwell decision statistics
Based on MHCLG data, the year to March 2026
92%
Overall approval rate
Above avg (87%) #77 of 296
94%
Householder approved
Above avg (90%) #101 of 296
47%
Decided in 8 weeks
Below avg (63%) #247 of 296
49%
Extended time limit
Above avg (41%) #218 of 296
77%
Minor dwellings approved
117 decided (1-9 homes)
95%
Major dwellings approved
19 decided (10+ homes)
96%
Change of use approved
47 decided
1,091
Total decisions
90 refused in the year to March 2026