Solar and renewables in Fylde

Fylde received 25 renewable energy applications in the last 12 months, including 2 battery storage sites and 2 heat pumps. Most rooftop panels are permitted development, so the applications here are typically the larger or more sensitive schemes.

4
|
1
|
0

Filter applications

Date received Last 90 days

Pick a year, or click two to span the range between them. Records before 2026 come from the archive.

Keywords in the address or description
Match

Literal text matches. For application types (extensions, solar, change of use...) use the categories above - no need to recreate them as keywords.

Showing 4 of 4 applications
26/0430 12 Jul 2026 Pending

STANLEY LODGE BARN SALWICK ROAD TREALES ROSEACRE AND WHARLES PRESTON PR4 3SN

APPLICATION TO VARY CONDITION 2 (APPROVED PLANS) OF PLANNING PERMISSION 24/0437 (ALLOWED BY APPEAL APP/M2325/W/25/3368363) INVOLVING "THE CHANGE OF US...

Fylde 12 Jul 2026
26/0330 14 Jun 2026 Pending

ARNOLD CLARK LYTHAM ST ANNES WAY WESTBY WITH PLUMPTONS LANCASHIRE FY4 5PQ

PRIOR APPROVAL FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS WITH A CAPACITY OF 208.8KWP, PURSUANT TO SCHEDULE 2, PART 14, CLASS J (AS AMENDED) OF THE...

Fylde 14 Jun 2026
26/0145 10 May 2026 Pending

LAND WEST OF CORKA LANE / NORTH OF CORKA BRIDGE HOUSE CORKA LANE WESTBY WITH PLUMPTONS LANCASHIRE FY8 4LX

INSTALLATION OF 24 GROUND MOUNTED PHOTOVOLTAIC SOLAR ARRAY PANELS, INCLUDING HARDSTANDING AND UNDERGROUND CABLE CONNECTION TO INVERTER AND BATTERY STO...

Fylde 10 May 2026
26/0186 3 May 2026 Pending

NOS. 63-69 (ODDS) SMITHY LANE, NOS. 1-7 (ODDS) SHERWOOD ROAD AND NOS. 1-15 (ODDS) & 21-115 (ODDS) SOUTH HEY LYTHAM ST ANNES

INSTALLATION OF WALL MOUNTED AIR SOURCE HEAT PUMPS (1 PER DWELLING) ON FLATS AT SOUTH HEY, SMITHY LANE AND SHERWOOD ROAD

Fylde 3 May 2026
Recency
Last 2 weeks
2-4 weeks
1-2 months
Older

Get free email alerts for new solar & renewables applications in Fylde

Set up alerts

Frequently asked questions

Do you need planning permission for solar panels on a house?
Most rooftop solar PV is permitted development if it doesn't project above the highest part of the roof or more than 200mm from the surface. Conservation areas, listed buildings and World Heritage Sites usually require full planning permission or Listed Building Consent.
Do you need planning permission for an air-source heat pump?
In most cases an outdoor heat pump unit smaller than 1.5m³ (raised in 2025 from 0.6m³) and at least 1m from the boundary qualifies as permitted development. Listed buildings and conservation areas may need full permission.
How big can a solar farm be without planning permission?
Ground-mounted commercial solar farms above 50kW effectively always require full planning permission. Smaller rooftop installations on industrial or agricultural buildings can sometimes use prior-approval rights under Part 14 of the GPDO.
Can I get email alerts for new solar & renewables applications in Fylde?
Yes. Click "Set up alerts" on this page and you'll get a daily or weekly email listing every new solar & renewables application published by Fylde. You can also narrow the alert to a postcode, street, or drawn area.

We check Fylde's planning portal daily. New solar & renewables applications appear here within a day of being published.