Castle Naze Farm,Cowlow Lane,Combs, Data via plota.co.uk

REGISTERED NP/HPK/0526/0538 - Full Planning Permission
Date received
22 Jul 2026
Date validated
22 Jul 2026
Postcode
SK23 9UX
Type
Full Planning Permission

Description

Erection of ground-standing solar panel array. Data via plota.co.uk

Last checked

Decision outlook

Plota predicted a decision around 15 Sept 2026; it is now day 55.

Day 55, past Peak District's usual 52 days for full applications. 94% are decided within thirteen weeks, so most likely by 21 Oct 2026.

Day 551 days to the 56-day target
75%decided within 8 weeks
84%approved
158decided in the last year

Plota live figures for full applications decided by Peak District in the last twelve months, from validation. Peak District decision record →

Site constraints 3

Peak District National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Agricultural land, grade 5
Very poor quality farmland, not best and most versatile. Predicted from the national soil map. The older provisional map agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.