Longwood Farm Combe Raleigh Honiton EX14 4TG Data via plota.co.uk

26/1382/AGR - Agricultural Notification/Determination Awaiting decision

Proposal

Application to determine if prior approval is required for 1no general purpose farm building Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
17 Aug 2026
Decision
Expected by 12 Oct 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 12 Oct 2026, from East Devon's recent agricultural works.

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Blackdown Hills National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Predicted from the national soil map. The older provisional map, which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Not green belt · No listed building at the site · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
East Devon
Application type
Agricultural Notification/Determination
Postcode
EX14 4TG
Received
17 Aug 2026
Validated
17 Aug 2026
Ward
Dunkeswell And Otterhead
Parish
Combe Raleigh
Applicant
Show

Decision outlook

Day 28 of the 56-day target. East Devon usually decides agricultural works by day 56.

Day 2828 days to the 56-day target
60%decided within 8 weeks
83%approved
77decided in the last year

Plota live figures for agricultural works decided by East Devon in the last twelve months, from validation. East Devon decision record →

Public comments

No public comments yet.

Last counted 10 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
LETTER/POST
Env. assessment
No
East Devon
Planning Authority Score
6.7/10
Good
#72 of 296 councils
Relevant to this application:
Householder decisions

East Devon ranks #103 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Devon decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #152 of 296
94%
Householder approved
Above avg (90%) #104 of 296
72%
Decided in 8 weeks
Above avg (63%) #103 of 296
34%
Extended time limit
Below avg (41%) #86 of 296
63%
Minor dwellings approved
168 decided (1-9 homes)
74%
Major dwellings approved
23 decided (10+ homes)
88%
Change of use approved
25 decided
1,321
Total decisions
157 refused in the year to March 2026