Stoney Orchard, RINGWOOD ROAD, NORTH GORLEY, FORDINGBRIDGE, SP6 2PB Data via plota.co.uk

26/00304CONS - Trees - Conservation Area Approved

Proposal

Fell 1 x Willow tree Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
19 Mar 2026
Approved
21 Apr 2026

Approved on 21 Apr 2026 · Delegated · Last checked 11 Jul 2026

Site constraints 11

Aerodrome safeguarding zone
Grade II listed: Hern Gate Farmhouse
List entry 1094856 · 25 m from the pin · 2 more listed buildings within 150 m (2 Grade II)
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Show the other 2 with distances
Historic England ↗
Nutrient neutrality catchment: River Avon SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
New Forest National Park
The park authority decides applications here. Great weight to conserving the landscape; major development restricted.
Landscape, scenic beauty and wildlife carry great weight, and major development is only allowed in exceptional circumstances.
Western Escarpment conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
2 Article 4 directions
Article 4 Direction Np New Forest Campsite · Article 4 Direction Np New Forest Recreational Campsite. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Public footpath 18 m away
Matters where it crosses or adjoins the site: obstructing a path without a diversion order is an offence, and work cannot start until the order is confirmed.
Compiled from highway authority data, not the legal definitive map. A few authorities have not published, so no path shown is not proof there is none.
Agricultural land, grade 2
Best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. The older provisional map, which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Special area of conservation 103 m away: The New Forest
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
SSSI 21 m away: The New Forest SSSI
Natural England may need consulting, depending on what is proposed.
Sites of special scientific interest are the best wildlife and geological sites in the country. Development likely to harm one is rarely permitted.
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Aerodrome safeguarding zoneCouncil record
Recorded by the council for this site.
Council site ↗
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in New Forest (Park) - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Application type
Trees - Conservation Area
Postcode
SP6 2PB
Received
19 Mar 2026
Validated
19 Mar 2026
Parish
Hyde Parish Council
Case officer
Show
Target decision
29 Apr 2026
Decision
Raise No Objection
Decision date
21 Apr 2026
Decision level
Delegated
Applicant
Show
Agent
ADS Tree Care

How this decision compares

Decided in 33 days from validation, 5 days slower than New Forest (Park)'s median of 28 for tree and landscaping works. Approved, as 99% of tree and landscaping works here are.

100%decided within 8 weeks
99%approved
348decided in the last year

Plota live figures for tree and landscaping works decided by New Forest (Park) in the last twelve months, from validation. New Forest (Park) decision record →

Consultation & key dates

Alt. reference
Emailed
Comments by
15 Apr 2026
Site or press notice
19 Mar 2026
New Forest (Park)
Planning Authority Score
3.3/10
Poor
#226 of 296 councils
Relevant to this application:
Other decisions

New Forest (Park) is slower than most councils at deciding householder applications, ranking #254 out of 296. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
New Forest (Park) decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #136 of 296
92%
Householder approved
Above avg (90%) #160 of 296
45%
Decided in 8 weeks
Below avg (63%) #254 of 296
44%
Extended time limit
Above avg (41%) #180 of 296
75%
Minor dwellings approved
28 decided (1-9 homes)
50%
Major dwellings approved
4 decided (10+ homes)
83%
Change of use approved
18 decided
487
Total decisions
55 refused in the year to March 2026