26/00424/TCA - Tree in Conservation Area Approved

Proposal

Recommendation after professional tree condition survey: Fell four beech trees due to recent failure of one beech tree due to fungal fruiting bodies Meripilus giganteus present. See submitted tree condition survey report Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
22 May 2026
Consultation
22 May 2026
Approved
7 Jul 2026

Approved on 7 Jul 2026 · Delegated Decision · Last checked 11 Jul 2026

Site constraints 5

Cotswolds National Landscape
Great weight to conserving the landscape; major development restricted.
Previously an area of outstanding natural beauty, which is still the designation in law. Since 2023 authorities must seek to further its purpose, not merely have regard to it.
Laverton Conservation Area conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Article 4 direction
Laverton Article 4 Direction. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. The older provisional map agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Tewkesbury - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Tewkesbury
Application type
Tree in Conservation Area
Postcode
WR12 7NA
Received
22 May 2026
Validated
22 May 2026
Ward
Isbourne
Parish
Buckland
Case officer
Show
Target decision
2 Jul 2026
Decision
No Objections
Decision date
7 Jul 2026
Decision level
Delegated Decision
Applicant
Show

How this decision compares

Decided in 46 days from validation, 9 days slower than Tewkesbury's median of 37 for tree and landscaping works. Approved, as 95% of tree and landscaping works here are.

92%decided within 8 weeks
95%approved
61decided in the last year

Plota live figures for tree and landscaping works decided by Tewkesbury in the last twelve months, from validation. Tewkesbury decision record →

Consultation & key dates

Alt. reference
PP-14927177
Consultation
22 May 2026
Comments by
5 Jun 2026
Env. assessment
No
Tewkesbury
Planning Authority Score
3.7/10
Below average
#212 of 296 councils
Relevant to this application:
Other decisions

Tewkesbury ranks #197 out of 296 councils for householder decision speed. 50% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Tewkesbury decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #144 of 296
93%
Householder approved
Above avg (90%) #139 of 296
57%
Decided in 8 weeks
Below avg (63%) #197 of 296
50%
Extended time limit
Above avg (41%) #228 of 296
69%
Minor dwellings approved
89 decided (1-9 homes)
100%
Major dwellings approved
12 decided (10+ homes)
86%
Change of use approved
37 decided
689
Total decisions
74 refused in the year to March 2026