27, Plimsoll Road, London, N4 2EN Data via plota.co.uk

P2026/0971/COL - Certificate of Lawfulness Listed Building (Proposed) Approved

Proposal

Erection of rear dormer with installation of rooflights on front slope. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
13 Apr 2026
Validated
23 Apr 2026
Approved
1 Jun 2026

Approved on 1 Jun 2026 · Last checked 12 Jul 2026

Site constraints 6

Article 4 directionCritical Drainage Group3_002
Air quality management area: Islington AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Local nature reserve 196 m away: Gillespie Park
Work nearby can need a habitats assessment.
Harm to a protected site is only accepted where there is no alternative and an overriding public interest.
Article 4 directionCouncil record
Some permitted development rights are withdrawn. The direction is on the council's register but not published as open data.
Council site ↗
Critical Drainage Group3_002Council record
Recorded by the council for this site.
Council site ↗
Also on the record
Inside the Islington built-up area; Town centre 84 m away: Finsbury Park.
Not affected
Outside flood zones 2 and 3 · Not green belt · No listed building at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Islington - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Islington
Application type
Certificate of Lawfulness Listed Building (Proposed)
Postcode
N4 2EN
Received
13 Apr 2026
Validated
23 Apr 2026
Ward
Finsbury Park
Case officer
Show
Target decision
7 Jun 2026
Decision
Approve with no conditions
Decision date
1 Jun 2026
Applicant
Show
Agent
George Kain

How this decision compares

Decided in 39 days from validation, 12 days faster than Islington's median of 51 for extensions. Approved, as 94% of extensions here are.

62%decided within 8 weeks
94%approved
486decided in the last year

Plota live figures for extensions decided by Islington in the last twelve months, from validation. Islington decision record →

Consultation & key dates

Alt. reference
PP-14854629
Islington
Planning Authority Score
2.9/10
Poor
#237 of 296 councils
Relevant to this application:
Other decisions

Islington is slower than most councils at deciding householder applications, ranking #260 out of 296. 53% of applications have the time limit extended, above the 41% national average. Householder applications are slightly more likely to be approved here (93%) than the national average (90%).

Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Islington decision statistics
Based on MHCLG data, the year to March 2026
89%
Overall approval rate
Above avg (87%) #132 of 296
93%
Householder approved
Above avg (90%) #130 of 296
43%
Decided in 8 weeks
Below avg (63%) #260 of 296
53%
Extended time limit
Above avg (41%) #241 of 296
89%
Minor dwellings approved
499 decided (1-9 homes)
100%
Major dwellings approved
1 decided (10+ homes)
89%
Change of use approved
19 decided
1,488
Total decisions
167 refused in the year to March 2026