116 Woodsford Square, London, W14 8DT Data via plota.co.uk

Approved CON/26/01623
Date received
14 Apr 2026
Date validated
14 Apr 2026
Decision date
8 May 2026
Postcode
W14 8DT

Description

Details required by Condition 4 (Flood Risk Assessment/Sustainable Drainage Systems Strategy) of planning permission (Removal of masonry staircase. Addition of ground floor single storey rear extension to rear facade, alteration to depth of balcony, installation of sliding doors to existing 3rd floor terrace. Alterations to fenestration and replacement of window frames) Data via plota.co.uk

Last checked

Associated applications 2

  • Part of

    Variationcouncil archive

    Conditions details submitted for 4

    • ConditionsDetails required by Condition 4 (Flood Risk Assessment/Sustainable Drainage Systems Strategy)…This applicationCON/26/01623

Site constraints 6

Holland Park conservation area
Demolition needs planning permission and permitted development is restricted.
The council must give weight to preserving or enhancing the area's character and appearance. Not every council has published its boundaries as open data.
Council document ↗
Article 4 direction
Article 4 - No 100. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Tree preservation order
Consent is needed before work on protected trees.
Not every council has published its orders as open data, so no order shown is not proof there is none.
Air quality management area: Kensington and Chelsea AQMA
The council has declared the area as failing an air quality objective.
Schemes that add traffic, parking or combustion plant are assessed against the area's action plan and may need an air quality assessment.
Council record ↗
Habitat network: Network Enhancement Zone 2
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the Kensington and Chelsea built-up area.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Kensington and Chelsea - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Kensington and Chelsea
Planning Authority Score
5.1/10
Average
#144 of 296 councils
Relevant to this application:
Householder decisions

Kensington and Chelsea ranks #174 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
Kensington and Chelsea decision statistics
Based on MHCLG data, the nine months to December 2025
93%
Overall approval rate
Above avg (87%) #58 of 296
94%
Householder approved
Above avg (90%) #110 of 296
61%
Decided in 8 weeks
Below avg (63%) #174 of 296
40%
Extended time limit
Below avg (41%) #152 of 296
94%
Minor dwellings approved
455 decided (1-9 homes)
87%
Change of use approved
53 decided
1,839
Total decisions
135 refused in the nine months to December 2025