5 Carlton House Terrace London SW1Y 5AQ
Description
Refurbish the existing commercial kitchen, replacement of the existing modern kitchen equipment, over-clad the existing wall tiles and overlay the existing floor tiles, removal of a low level nib partition wall and introduce new floor gulleys connecting into existing drainage.
Westminster ranks #172 out of 282 councils for householder decision speed. Only 27% of applications have the time limit extended, well below the 40% national average - the council usually decides on time. Westminster is also one of the strictest councils - it refuses more householder applications than almost any other, with only 79% approved vs 90% nationally.
Nearby applications
The Dilly 21 Piccadilly London W1J 0BH
Detailed drawings of the existing windows and historic secondary glazing, and th...
The Dilly 21 Piccadilly London W1J 0BH
Detailed drawings of the existing windows and historic secondary glazing, and th...
29 St James's Place London SW1A 1NR
Detailed drawings showing the following alteration(s) to the scheme - removal of...
29 St James's Place London SW1A 1NR
Detailed drawings showing the following alteration(s) to the scheme - removal of...
The National Gallery Trafalgar Square London WC2N 5DN
Reconfiguration and refurbishment of cafe and restaurant WC facilities within th...
19 - 20 Irving Street London WC2H 7AU
Display of an internally illuminated fascia sign measuring 1.01m x 5.55m; and an...