Coryton Park Kilmington Axminster EX13 7RD Data via plota.co.uk

26/1253/FUL - Full Application Awaiting decision

Proposal

Proposed roofing of existing concrete yard Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
13 Jul 2026
Decision
Expected by 7 Sept 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 14 Sept 2026, from East Devon's recent commercial and major works.

Site constraints 5

Grade II listed: Coryton Park
List entry 1170723 · 1 m from the pin
Listed building consent is needed for work that affects the special interest of a listed building, inside or out, on top of planning permission. Setting can be a consideration for buildings nearby; there is no fixed radius.
Historic England ↗
Nutrient neutrality catchment: River Axe SAC
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 3b
Not best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. The older provisional map agrees.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
National landscape 394 m away: East Devon.
Not affected
Outside flood zones 2 and 3 · Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in East Devon - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
East Devon
Application type
Full Application
Postcode
EX13 7RD
Received
13 Jul 2026
Validated
13 Jul 2026
Ward
Newbridges
Parish
Kilmington
Applicant
Show

Decision outlook

Day 63, past the statutory target. 75% of commercial and major works in East Devon are decided within thirteen weeks, which runs to 12 Oct 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 10 Sept 2026.

Day 637 days past the 56-day target
50%decided within 8 weeks
93%approved
8%go to committee

Plota live figures for commercial and major works decided by East Devon in the last twelve months, from validation. East Devon decision record →

Public comments

No public comments yet.

2 neighbours consulted · Last counted 10 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Alt. reference
PP-15027404
Site or press notice
22 Jul 2026
Env. assessment
No
East Devon
Planning Authority Score
6.7/10
Good
#72 of 296 councils
Relevant to this application:
Householder decisions

East Devon ranks #103 out of 296 councils for householder decision speed. Householder applications are slightly more likely to be approved here (94%) than the national average (90%).

These figures are council-wide context, not a prediction for this application. View full council performance
East Devon decision statistics
Based on MHCLG data, the year to March 2026
88%
Overall approval rate
Above avg (87%) #152 of 296
94%
Householder approved
Above avg (90%) #104 of 296
72%
Decided in 8 weeks
Above avg (63%) #103 of 296
34%
Extended time limit
Below avg (41%) #86 of 296
63%
Minor dwellings approved
168 decided (1-9 homes)
74%
Major dwellings approved
23 decided (10+ homes)
88%
Change of use approved
25 decided
1,321
Total decisions
157 refused in the year to March 2026