3 Edenhurst Close Norwich NR4 7QT Data via plota.co.uk

26/00635/TPO - Works to Trees Subject to TPO Awaiting decision

Proposal

T1/T2 Douglas Fir: These trees have previously been lopped at about 8m. The subsequent regrowth has produced a ragged and distorted crown. Both trees are suppressed by the non-lopped trees in the garden of No. 1. These will always be deformed specimens. The preferred option is to fell them and plant replacements in the woodland belt beside Judge's Walk. Failing that a crown reduction from 13m to 9m in height and a reduction from 5m to 3m in radial spread. G3 Silver birch: This group of three young silver birch has also previously been lopped, this time at around 6m. The regrowth has been drawn up to produce very long and slender branches without a discernible leading stem or any natural form. It is proposed to reduce the crown on each tree, singling each tree to a single leading shoot and reducing in height from 12m to 8.5m and reducing radial spread from 4m to 3m. T4 Scots pine: This semi-mature pine has a leaning stem and suppresses a promising young beech tree. It is proposed to remove the pine and encourage the beech to develop fully through formative pruning. Data via plota.co.uk

View original council record ↗

Application progress

Received
26 Jun 2026
Decision
Awaiting decision

This application is under consideration - no decision has been issued yet.

Norwich
Planning Authority Score
8.6/10
Excellent
#15 of 296 councils
Relevant to this application:
Householder decisions

Norwich is faster than most councils at deciding householder applications, ranking #68 out of 296. Only 22% of applications have the time limit extended, well below the 41% national average - the council usually decides on time. Householder applications are more likely to be approved here than most councils, with a 97% approval rate vs 90% nationally.

More permissive than most councils
97% approved vs 90% nationally
These figures are council-wide context, not a prediction for this application. View full council performance
Norwich decision performance
Based on MHCLG data, the year to March 2026
96%
Overall approval rate
Above avg (87%) #14 of 296
97%
Householder approved
Above avg (90%) #39 of 296
76%
Decided in 8 weeks
Above avg (63%) #68 of 296
22%
Extended time limit
Below avg (41%) #24 of 296
94%
Minor dwellings approved
34 decided (1-9 homes)
100%
Major dwellings approved
2 decided (10+ homes)
89%
Change of use approved
38 decided
538
Total decisions
23 refused in the year to March 2026