St Michaels Church Church Walk Bodenham Hereford Herefordshire HR1 3JU Data via plota.co.uk

Valid P262544/K - Works to Trees in a Conservation Area
Date received
1 Sept 2026
Date validated
1 Sept 2026
Postcode
HR1 3JU
Type
Works to Trees in a Conservation Area

Description

Atlas Cedar - the tree is positioned in the area of more recent graves and has a high target occupancy. Due to historic limb failures the trees crown is out of balance with large limbs overextended, reduce the overextended limbs by removing 2-3 metres of growth to a suitable growth point, remove major deadwood and limbs with hazard prone characteristics, thin canopy by approximately 10% to reduce sailarea and minimise risk of future limb loss. Data via plota.co.uk

Last checked

Decision outlook

Plota predicts a decision around 8 Oct 2026, from Herefordshire's recent tree and landscaping works.

Day 11 of the 56-day target. Herefordshire usually decides tree and landscaping works by day 37.

Day 1145 days to the 56-day target
98%decided within 8 weeks
88%approved
113decided in the last year

Plota live figures for tree and landscaping works decided by Herefordshire in the last twelve months, from validation. Herefordshire decision record →

Site constraints 4

Flood zone 3, rivers and sea
High chance: a 1 in 100 or greater annual chance from rivers, or 1 in 200 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: River Wye SAC (River Lugg SSSI)
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
Agricultural land, grade 1
Best and most versatile land (grades 1, 2 and 3a). Predicted from the national soil map. The older provisional map, which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Enhancement Zone 1
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Herefordshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Herefordshire
Planning Authority Score
3.3/10
Poor
#224 of 296 councils
Relevant to this application:
Other decisions

Herefordshire is slower than most councils at deciding householder applications, ranking #250 out of 296. The council extends the time limit on 60% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Herefordshire decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #56 of 296
95%
Householder approved
Above avg (90%) #79 of 296
46%
Decided in 8 weeks
Below avg (63%) #250 of 296
60%
Extended time limit
Above avg (41%) #269 of 296
89%
Minor dwellings approved
278 decided (1-9 homes)
67%
Major dwellings approved
18 decided (10+ homes)
92%
Change of use approved
104 decided
1,406
Total decisions
96 refused in the year to March 2026