8 Eccleriggs Avenue Barrow-In-Furness Cumbria LA14 4NG Data via plota.co.uk
PENDING
B20/2026/0296
Description
Change of use of vacant land to domestic use including erection of new boundary walls. Data via plota.co.uk
Nearby new applications
Historical activity at this location
15 previous applications on record - archival context, not part of the live application.
This property
Previous applications at this address
2025
Two storey rear and side extension, single storey front extension and driveway widening…
2025
Two storey rear and side extension, single storey front extension and driveway widening…
2025
Two storey rear and side extension, single storey front extension and driveway widening…
Within ~100m
Nearby activity
2022
Approved
22 Roanhead Lane Barrow-in-Furness Cumbria LA14 4HZ
Single storey rear extension forming extended kitchen and dining room.
2022
Approved
22 Roanhead Lane Barrow-in-Furness Cumbria LA14 4HZ
Single storey rear extension forming extended kitchen and dining room.
2022
Approved
22 Roanhead Lane Barrow-in-Furness Cumbria LA14 4HZ
Single storey rear extension forming extended kitchen and dining room.
2021
Approved
3 Eccleriggs Avenue Barrow-in-Furness Cumbria LA14 4NG
Erection of a single story side extension which includes a store facility and dressing ar…
2021
Approved
3 Eccleriggs Avenue Barrow-in-Furness Cumbria LA14 4NG
Erection of a single story side extension which includes a store facility and dressing ar…
2021
Approved
3 Eccleriggs Avenue Barrow-in-Furness Cumbria LA14 4NG
Erection of a single story side extension which includes a store facility and dressing ar…
2020
Approved
8 Roanhead Lane, Barrow-in-Furness, Cumbria, LA14 4HZ
Listed Building Consent for the replacement of 0.6m high stone wall with a stone wall to…
2020
Approved
8 Roanhead Lane, Barrow-in-Furness, Cumbria, LA14 4HZ
Replacement of 0.6m high stone wall with a stone wall to a maximum height of 1.1m to fron…
2020
Approved
8 Roanhead Lane, Barrow-in-Furness, Cumbria, LA14 4HZ
Listed Building Consent for the replacement of 0.6m high stone wall with a stone wall to…
2020
Approved
8 Roanhead Lane, Barrow-in-Furness, Cumbria, LA14 4HZ
Replacement of 0.6m high stone wall with a stone wall to a maximum height of 1.1m to fron…
2020
Approved
8 Roanhead Lane, Barrow-in-Furness, Cumbria, LA14 4HZ
Listed Building Consent for the replacement of 0.6m high stone wall with a stone wall to…
2020
Approved
8 Roanhead Lane, Barrow-in-Furness, Cumbria, LA14 4HZ
Replacement of 0.6m high stone wall with a stone wall to a maximum height of 1.1m to fron…
Westmorland and Furness
Planning Authority Score
2.8/10
Poor
#240 of 292 councils
Relevant to this application:
Change of use
Westmorland and Furness is slower than most councils at deciding householder applications, ranking #234 out of 292. 52% of applications have the time limit extended, above the 40% national average. Householder applications are slightly more likely to be approved here (92%) than the national average (90%).
Slower than most councils
for householder decisions
These figures are council-wide context, not a prediction for this application.
View full council performance
Westmorland and Furness decision performance
Based on MHCLG data, 2025
92%
Overall approval rate
Above avg (87%) #90 of 292
92%
Householder approved
Above avg (90%) #161 of 292
51%
Decided in 8 weeks
Below avg (64%) #234 of 292
52%
Extended time limit
Above avg (40%) #239 of 292
85%
Minor dwellings approved
72 decided (1-9 homes)
100%
Major dwellings approved
21 decided (10+ homes)
86%
Change of use approved
132 decided
1,223
Total decisions
95 refused in 2025