Hayling Seaside Railway, Sea Front, Hayling Island, PO11 0AG Data via plota.co.uk

Pending APP/26/00212
Council
Date received
1 Jun 2026
Date validated
1 Jun 2026
Postcode
PO11 0AG

Description

Construction of a Heritage Centre, including facilities of a shop selling Railway and Heritage Memorabilia adjacent to the existing Eastoke Corner Station and depot. The new building to include provision for an accessible toilet and first floor mezzanine floor incorporating a small office and storage area accessible by stairs and a lift. Data via plota.co.uk

Last checked

Decision outlook

Plota predicts a decision by 28 Oct 2026, from Havant's recent full applications.

Day 105 of the 56-day target. Havant usually decides full applications by day 147.

Day 10542 days to the predicted decision (day 147)
17%decided within 8 weeks
92%approved
12decided in the last year

Plota live figures for full applications decided by Havant in the last twelve months, from validation. Havant decision record →

Site constraints 5

Flood zone 2, rivers and sea
Medium chance: between a 1 in 100 and 1 in 1,000 annual chance from rivers, or 1 in 200 to 1 in 1,000 from the sea. Any development here needs a flood risk assessment. Defences are not counted.
The Environment Agency flood map for planning. Homes in zone 3 must also pass the sequential test. Surface water flooding is a separate map.
Flood map ↗
Nutrient neutrality catchment: Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
New homes and overnight accommodation must show nutrient neutrality before approval.
Natural England advice: extra wastewater in these catchments harms protected habitats, so schemes must offset their nutrient load, usually through credits.
3 Article 4 directions
0164B3 · 0164B1 · 0164B2. Named permitted development rights are withdrawn here.
An Article 4 direction withdraws particular permitted development rights, so work that would normally need no application needs one here. Not every council has published its directions.
Habitat network: Lowland dry acid grassland
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Also on the record
Inside the South Hayling built-up area.
Not affected
Not green belt · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Havant - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service
Havant
Planning Authority Score
3/10
Poor
#235 of 296 councils
Relevant to this application:
Householder decisions

Havant is one of the slowest councils in England for householder decisions, ranking #283 out of 296. The council extends the time limit on 59% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (95%) than the national average (90%).

Among the slowest councils in England
for householder decisions
These figures are council-wide context, not a prediction for this application. View full council performance
Havant decision statistics
Based on MHCLG data, the year to March 2026
94%
Overall approval rate
Above avg (87%) #39 of 296
95%
Householder approved
Above avg (90%) #78 of 296
31%
Decided in 8 weeks
Below avg (63%) #283 of 296
59%
Extended time limit
Above avg (41%) #264 of 296
82%
Minor dwellings approved
17 decided (1-9 homes)
57%
Major dwellings approved
7 decided (10+ homes)
86%
Change of use approved
21 decided
408
Total decisions
26 refused in the year to March 2026