29 Ashley Road, Bradford On Avon, BA15 1RU Data via plota.co.uk

PL/2026/04474 - Householder planning permission Submitted

Proposal

Demolition of existing porch. Erection of a double storey front extension, with height to match the existing eave heights and internal alterations. Data via plota.co.uk

View original council record ↗Last checked

Application progress

Received
17 Jul 2026
Decision
Expected by 11 Sept 2026

This application is under consideration - no decision has been issued yet. Plota predicts a decision around 13 Sept 2026, from Wiltshire's recent demolitions. The consultation period closed on 26 Aug 2026.

Site constraints 3

Green belt: Bath and Bristol
Inappropriate development needs very special circumstances.
Green belt policy allows a short list of exceptions, such as limited extensions and replacement buildings. Anything else needs very special circumstances that clearly outweigh the harm.
Agricultural land, grade 4
Poor quality farmland, not best and most versatile. Predicted from the national soil map. The older provisional map, which most planning maps still show, had this area as grade 3. The predicted grade is Defra's current estimate; only a site survey settles it.
Where development of farmland is needed, policy prefers poorer land over the best and most versatile (grades 1, 2 and 3a). Three sources: Natural England's post-1988 field surveys, which are definitive where they exist; the Defra predictive map for England (2025) and the Welsh Government predictive map, modelled from the soil map with 3a and 3b split; and the 1970s provisional map, which planners and other services still show, coarser and with grade 3 undivided. Where the provisional and predicted grades disagree, treat the predicted grade as the current estimate and expect an application to carry its own survey.
Habitat network: Network Expansion Zone
Where habitat is joined up enough to work as a network. Context, not a constraint on its own.
Not affected
Outside flood zones 2 and 3 · No scheduled monument at the site

Checked on 11 September 2026. Historic England, the Environment Agency, Natural England and council datasets, Open Government Licence. A boundary can run through a site and the council holds the definitive record: confirm with the council before relying on this.

Work with planning data?

Every application in Wiltshire - and every UK council - as a live feed, an API, or a bulk CSV export.

About Plota's data service

Important details

Council
Wiltshire
Application type
Householder planning permission
Postcode
BA15 1RU
Received
17 Jul 2026
Validated
17 Jul 2026
Ward
Bradford-on-Avon North ED
Parish
Bradford-on-Avon CP
Case officer
Show

Decision outlook

Day 58, past the statutory target. 82% of demolitions in Wiltshire are decided within thirteen weeks, which runs to 16 Oct 2026; extensions of time are common, and the council need not decide on the day. Last seen undecided on 12 Sept 2026.

Day 582 days past the 56-day target
54%decided within 8 weeks
94%approved
226decided in the last year

Plota live figures for demolitions decided by Wiltshire in the last twelve months, from validation. Wiltshire decision record →

Public comments

2comments received
1 objecting1 neutral

Last counted 12 Sept 2026

Read the comments on the council site ↗

Consultation & key dates

Comments by
26 Aug 2026
Wiltshire
Planning Authority Score
3.9/10
Below average
#203 of 296 councils
Relevant to this application:
Householder decisions

Wiltshire is slower than most councils at deciding householder applications, ranking #225 out of 296. The council extends the time limit on 55% of applications - one of the highest rates in England. Expect your application to take longer than the standard deadline. Householder applications are slightly more likely to be approved here (96%) than the national average (90%).

Frequently extends decision deadlines
expect longer than the statutory limit
These figures are council-wide context, not a prediction for this application. View full council performance
Wiltshire decision statistics
Based on MHCLG data, the year to March 2026
93%
Overall approval rate
Above avg (87%) #71 of 296
96%
Householder approved
Above avg (90%) #65 of 296
53%
Decided in 8 weeks
Below avg (63%) #225 of 296
55%
Extended time limit
Above avg (41%) #252 of 296
78%
Minor dwellings approved
339 decided (1-9 homes)
90%
Major dwellings approved
48 decided (10+ homes)
92%
Change of use approved
160 decided
3,659
Total decisions
256 refused in the year to March 2026